Similar Projects
Coleman Road Subdivision
New Construction
Conception
Jacksonville, FL

Catty Shack
New Construction, Addition
Conception
$8,000,000 est. value
Jacksonville, FL

Southeast Quadrant
New Construction
Design
Jacksonville, FL

Lamb Tail Lane West Expansion
New Construction
Post-Bid
Jacksonville, FL 32256

Palm Avenue Improvements – Gary Street To Prudential Drive
New Construction
Post-Bid
Jacksonville, FL 32099

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

Community Field And Stadium For Edward Waters College
New Construction
Construction
$4,300,000 est. value
Jacksonville, FL 32099

The Lofts At Murray Hill - Site
New Construction
Construction
Jacksonville, FL 32205

11134 New Kings Road RV Park
New Construction
Pending Verification
Jacksonville, FL 32219

Jacksonville Zoo Docks
New Construction
Pending Verification
$1,000,000 est. value
Jacksonville, FL 32218

Loretto Road Subdivision
New Construction
Conception
Jacksonville, FL

Southeast Quadrant Residential Phase 1A
Post-Bid
Jacksonville, FL

Garden Street Subdivision
New Construction
Construction
Jacksonville, FL

Aladdin Road Subdivision
New Construction
Conception
Jacksonville, FL

Sandridge Phase 1 Infrastructure Project
Post-Bid
Jacksonville, FL 32099

Last Updated 10/14/2020 12:57 AM
Project Title

Saint John's River Power Park Byproducts Storage Area Decommissioning

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32202   (Duval County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consist of, but is not limited to the following: 1. Excavation and relocation of coal combustion residual wastes located outside the final limit of waste boundary as shown on the drawings, including placement and compaction of excavated materials within the BSA-B limit of waste boundary. 2. Construction of the containment berm and perimeter ditch on the northern and western sides of BSA-B. 3. Excavation of storm water Pond A to the lines and grades shown on the drawings. Clean excavated materials may be used for general fill. Work also includes the removal/abandonment of two existing control structures. 4. Abandonment and demolition of the contact water force main and associated pump station. Work also includes the removal of sediments from the contact water ponds and grading of contact water ponds to the grades and lines shown in the drawings. 5. Grading and compaction of the final cover subgrade to the lines and grades shown on the drawings. 6. Installation of the LLDPE cover system with 18-inch thick granular fill protective cover and 6-inch thick topsoil and sod. The closure system includes a layer of geotextile above the LLDPE with toe drain system as indicated on the plans. Work also includes construction of rim and final cover bench ditches with underdrain piping. 7. Installation of stormwater management system components including downlet pipes, transition structures, energy dissipators, and culverts. Work also includes grading of perimeter ditch channels.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents