Similar Projects
Stephensville - Shiocton Const / Resurf
Infrastructure
Design
$3,000,000 CJ est. value
Hortonville, WI 54944

Stephensville - Shiocton Const / Resurf
Infrastructure
Design
$3,000,000 CJ est. value
Hortonville, WI 54944

Appleton Lower Dam Gates 1-5 Replacement
Infrastructure
Bidding
$5,000,000 CJ est. value
Appleton, WI 54911

Snow and Ice Plowing: Airport Landside
Term Contract
Post-Bid
Appleton, WI 54914

Snow and Ice Plowing: Airport Airside
Term Contract
Post-Bid
Appleton, WI 54914

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

9th Street Area Utility Relay
Results
Kaukauna, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Appleton Public Library Construction/Renovation BU 32C Landscaping / Irrigation
New Construction, Infrastructure - 120,000 SF
Pending Verification
$4,531,723 CJ est. value
Appleton, WI 54911

Kwik Trip #887 Building Addition / Grand Chute
Addition, Demolition, Infrastructure - 1,463 SF
Pending Verification
$400,000 CJ est. value
Appleton, WI 54913

T. Grand Chute, College Ave Des-Bld / BRRPL
Demolition, New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Appleton, WI 54914

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

CTH Z - Curb Replacement and Sidewalk Installation
Results
Kaukauna, WI

O'Reilly Auto Parts (HRV) #6611 / Hortonville
New Construction, Infrastructure - 7,225 SF
Construction
$1,300,000 CJ est. value
Hortonville, WI 54944

Last Updated 03/13/2023 01:06 AM
Project Title

Cobble Creek Drive Storm Sewer

Physical Address View project details and contacts
City, State (County) Grand Chute, WI 54913   (Outagamie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $304,866 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of construction of 2,545 linear feet of storm sewer (12-inch to 18-inch) along Cobble Creek Drive and Auburn Estates Subdivision including asphalt street repair (990 SY), curb and gutter repair (45 LF), erosion controls and grass restoration.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents