Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

7th Avenue - PCC Pavement - New
Infrastructure
Bidding
Camanche, IA

Z40 - HMA Resurfacing
Infrastructure
Bidding
IA

700 blocks South 3rd Street and South 4th Street Reconstruction
Infrastructure
Post-Bid
Clinton, IA 52732

700 blocks South 3rd Street and South 4th Street Reconstruction
Infrastructure
Post-Bid
Clinton, IA 52732

Microsurfacing
Infrastructure
Results
IA

Fog Seal
Infrastructure
Results
IA

Asphalt Street Rehab: 22nd Avenue and Pershing Boulevard Details
Infrastructure
Bidding
Clinton, IA 52732

Microsurfacing
Infrastructure
Post-Bid
$160,657 est. value
Clinton, IA

Asphalt Street Overlay
Infrastructure
Results
Clinton, IA

Camanche 2021 Street Improvements Phase 3
Infrastructure
Results
Camanche, IA 52730

Mill Creek Parkway Concrete Patching
Infrastructure
Results
Clinton, IA 52734

Fog Seal
Infrastructure
Results
IA

South 8th Street Sewer Separation
Infrastructure
Results
$1,014,200 est. value
Clinton, IA 52732

South 10th Street Sewer Separation
Infrastructure
Results
Clinton, IA 52732

Last Updated 04/08/2022 08:34 AM
Project Title

700 Blocks South 3rd Street and South 4th Street Reconstruction

Physical Address View project details and contacts
City, State (County) Clinton, IA 52732   (Clinton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $553,860
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction of the 700 blocks of So. 3rd St. and So. 4th St. The full reconstruction of these blocks calls for the removal of pavement (3761 SY), removal of sidewalk (389 SY), excavation (1033 CY), new 9” PCC pavement (2774 SY) with 12” of modified sub-base (1033 CY). This also includes other associated work, driveway removal and replacement, ADA ramps at 6 street corners, adjusting a few manholes and installation of approximately 1100 LF of sub-drain. In addition to reconstructing the 700 block of So. 4th St., we will also be milling and overlaying the intersection of So. 4th St. and 7th Ave. So.; this 670 SY area will require nearly 100 tons of HMA at 2.5” installed in two lifts. This is also an opportunity to separate four manholes from the storm sewer system, four new intakes will be installed, along with 200 LF of 15” Reinforced Concrete Pipe. In order to better suit the use of these two blocks, each roadway will be reduced by one lane of travel, So. 4th St. will become a three lane road, while So. 3rd St. will be a two lane road with a parking lane. Subsequently by reducing one lane of traffic on So. 3rd St., we will be closing the merge lane of traffic from 8th Ave. So. (not the bridge). Upon completion, each block will require new pavement markings. Because these are highways, the work must be completed while the roads remain open, half of the road will need to be removed and constructed at a time.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents