Similar Projects
Last Updated | 03/18/2021 02:52 AM |
Project Title | RR-20-4549 - Fiber Optic Construction Upon Request |
Physical Address | View project details and contacts |
City, State (County) | Downers Grove, IL (DuPage County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The location of the services to be performed for this contract is throughout the entire Illinois Tollway System including Reagan Memorial Tollway (I-88), Jane Addams Memorial Tollway (I-90), Tri-State Tollway (I-294/I-94), Veterans Memorial Tollway (I-355), and Elgin O’Hare Expressway (IL 390). The work under this contract includes placement of underground conduits of various sizes and counts, placement of bridge conduits to support fiber optics, placement of handholes and manholes of various sizes, placement of fiber in conduits, lowering of existing fiber optic facilities and removal of fiber optic conduit, cables, and structures. The fiber optic relocations to be constructed under this contract shall be performed as directed by the Illinois Tollway throughout the Illinois Tollway System on a task-by-task order basis. of handholes and manholes of various sizes, placement of fiber in conduits, lowering of existing fiber optic facilities and removal of fiber optic conduit, cables, and structures. |
||||||||||||||||||||
Details | Bridge, Renovation.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |