Similar Projects
Savant Office
New Construction
Conception
Bentonville, AR 72712

Canoo Corporate Headquarters
New Construction
Conception
Bentonville, AR

Fox Meadow Subdivision
New Construction, Infrastructure - 35,000 SF
Design
$3,900,000 CJ est. value
Siloam Springs, AR 72761

Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Design
$12,100,000 CJ est. value
Rogers, AR 72758

Detrola Motel
New Construction, Infrastructure
Bidding
$32,000,000 CJ est. value
Bentonville, AR 72712

Detrola Motel
New Construction, Infrastructure
Bidding
$32,000,000 CJ est. value
Bentonville, AR 72712

Stonehaven Drive Water Main Replacement
Term Contract
Post-Bid
Bella Vista, AR 72715

Clear Creek Lift Station Upgrade
Renovation
Post-Bid
AR

Chestnut Sewer and Water
Infrastructure
Results
Rogers, AR

Murdock Road to Main Street (Highway 112) 12-Inch Water Main
Infrastructure
Results
Cave Springs, AR

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

SW 4th and B Street Townhomes
New Construction, Infrastructure - 10,451 SF
Construction
$2,000,000 CJ est. value
Bentonville, AR 72712

Morning Star Subdivision
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Bentonville, AR 72712

Morning Star Subdivision
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Bentonville, AR 72712

NWA Science Center
New Construction
Conception
Lowell, AR 72745

Last Updated 03/08/2023 02:26 PM
Project Title

Western Corridor Pump Station

Physical Address View project details and contacts
City, State (County) Lowell, AR 72745   (Benton County)
Category(s) Commercial, Heavy and Highway, Laboratory, Sewer and Water
Sub-Category(s) Laboratory, Lift and Pump Stations, Office, Site Development, Warehouse/Storage, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $170,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the Wester Corridor Pump Station (WCPS and associated facilited for Beaver Water District (BWD) to pump treated water to their four Customer Cities from a new remote site. The WCPS building includes a pump room, medium-voltage electrical wing, and administrative wing. The pump room will include dual 60-inch treated water lines in a central trench, horizontal split case pumps, surge tank, valves bridge crane, and appurtenances. The medium-voltage electrical wing shall consist of two air-conditioned rooms to house switchgear, variable frequency drives, and HVAC equipment. The administrative wing will include a workshop, mechanical room, low-voltage electrical room, control room, storage, restrooms, office, and laboratory space. The work also includes construction of an Electrical Building and two (2) 1,400kW natural gas generators in stand-alone sound attenuated enclosures and associated equipment, The Electrical Building will house the paralleling switchgear, ancillary electrical system, storage, and HVAC equipment. The work shall include all miscellaneous electrical, instrumentation, mechanical systems, utility tie-ins, and sitework to provide a complete and functional system. The work also includes improvements to West Miller Road as shown in the contract drawings.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Laboratory Furniture.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents