Similar Projects
Roofing Envelope Services
Post-Bid

Beck Valves Parts and Ancillary Services
Term Contract
Post-Bid
Atlanta, GA

Kennesaw City Hall Roof Renovation
Results
Kennesaw, GA 30144

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Roofing MACC
Post-Bid

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Turner Middle School Gymnasium Roof Replacement
Renovation
Post-Bid
Atlanta, GA 30314

Addison and Baker Elementary Schools Freezer and Cooler Replacement
Results
Marietta, GA 30068

Residential Roof Repair For (10) Ten Houses
Post-Bid
Macon, GA

Griffin Middle School Roof Replacement
Results
Less than $1,747,800 est. value
Smyrna, GA 30082

Roofing Repair and Maintenance
Post-Bid

Campbell Middle School Roof Replacement
Results
Less than $1,649,840 est. value
Smyrna, GA 30080

Dowell Elementary School and Labelle Elementary School Roof Replacement
Results
Less than $1,211,075 est. value
Marietta, GA 30064

Steam and Condensate Underground Project
Results
Atlanta, GA 30332

Cobb Parks - Various Standing Seam Metal Roof Replacements - Group 1
Results
Marietta, GA 30060

Last Updated 03/16/2021 08:27 AM
Project Title

Administrative Center Mechanical and Roof Improvements

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30339   (Cobb County)
Category(s) Single Trades
Sub-Category(s) Mechanical, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

ROOF– Remove existing roof system to deck and replace with new TPO roof system (includes both main roof and penthouse roof). HVAC – Remove the existing abandoned-in-place chiller and replace with new chiller HVAC – Remove the existing cooling tower and replace with new cooling tower MISC. – Install new ladder from main roof to penthouse roof; repair and refinish existing penthouse enclosure & screen wall

Details

Division 02 - Existing Conditions.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents