Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

100th Avenue Paving
Infrastructure
Results
Hersey, MI

Pit Cleaning-Bascule Bridges, Multiple Services
Infrastructure
Post-Bid

165th Avenue Improvements
Infrastructure
Results
$1,617,708 CJ est. value
Hersey, MI 49639

Pine River Area Schools 2020 Bond Projects New Soccer Announcers Booth
New Construction, Infrastructure
Post-Bid
$27,000 CJ est. value
Leroy, MI 49655

Sewer System Upgrades
Renovation, Infrastructure
Results
$138,008 CJ est. value
Evart, MI 49631

Construction Contract to Expand and Renovate the Current Township Hall
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Tustin, MI 49688

HMA Overlays and Paving
Infrastructure
Results
$337,439 CJ est. value
Hersey, MI 49639

2023 Sidewalk Repair Program
Infrastructure
Post-Bid
$200,000 CJ est. value
Avondale, MI 49631

RFP Construction Manager - Parks and Recreation Division ARPA Improvements Region #4 - Rose Lake District and Metro District
New Construction, Renovation, Infrastructure
Post-Bid
$37,837,136 CJ est. value
Rose Lake Township, MI 49655

O'Reilly Auto Parts (EVT) #6273 / Evart
New Construction, Infrastructure - 7,725 SF
Post-Bid
$400,000 CJ est. value
Evart, MI 49631

Last Updated 05/06/2023 05:08 AM
Project Title

Gravel Reconstruction Including Roadway Realignment, Shoulder Widening, Drainage Improvements, Guardrail Installation and Pavement Markings on 14 Mile Road

Physical Address View project details and contacts
City, State (County) Evart, MI 49631   (Osceola County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $185,755 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

0.24 mi of gravel reconstruction including roadway realignment, shoulder widening, drainage improvements, guardrail installation and pavement markings on 14 Mile Road along the Middle Branch River west of 5th Avenue, Osceola County. This is a Local Agency project. This is a Small Business Program project. Only those approved by MDOT as a Small Business may be eligible to bid as a prime contractor. Net classification required for this project is 143 Ea In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb and Ea. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec HSIP 67000 Job No 214218A Federal No 23A0387 MI DOT - 2305 018- Gravel Reconstruction Including Roadway Realignment, Shoulder Widening, Drainage Improvements, Guardrail Installation and Pavement Markings on 14 Mile Road Completion- 8/25/2023 MBE (4.9%), WBE (6.9%), DBE (0%)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents