Similar Projects
Police Station Relocation
New Construction
Conception
Leander, TX

Fire Station #6
New Construction
Conception
$7,035,000 est. value
Leander, TX

Loram Technologies New Office/Production Facility
New Construction, Infrastructure - 96,450 SF
Design
$23,000,000 CJ est. value
Georgetown, TX 78626

Azola Avery Centre / Round Rock
New Construction, Infrastructure - 473,000 SF
Design
$62,000,000 CJ est. value
Round Rock, TX 78665

National Chain Retail Store / Liberty Hill
Addition, Demolition, Infrastructure - 18,748 SF
Bidding
$500,000 CJ est. value
Liberty Hill, TX 78642

RFQ Engineering - Sidewalk Gap Closure Phase 6
Infrastructure
Bidding
$300,000 CJ est. value
Cedar Park, TX 78613

Costco New Warehouse / Georgetown
New Construction, Infrastructure - 160,437 SF
Post-Bid
$13,260,000 CJ est. value
Georgetown, TX 78628

Leander Fire Station No. 2 Addition and Renovation
Renovation, Addition - 18,794 SF
Post-Bid
Leander, TX 78641

TTC Land Site Clearing
Infrastructure
Results
$56,950 est. value
Florence, TX 76527

Santa Rita Ranch Phase 1, Section 10 - Street Excavation, Drainage, Water, Wastewater and Erosion Control Improvements
Infrastructure
Results
TX

Holt Track Shop
New Construction, Infrastructure - 25,320 SF
Construction
$3,200,000 CJ est. value
Georgetown, TX 78628

Samsung Semiconductor Chipmaking Plant
New Construction, Infrastructure - 6,000,000 SF
Construction
$9,000,000,000 CJ est. value
Taylor, TX 76574

QuikTrip 4183
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Georgetown, TX 78628

Black Rock Coffee / Georgetown
New Construction, Infrastructure - 1,887 SF
Pending Verification
$700,000 CJ est. value
Georgetown, TX 78628

Police Station Renovation
Renovation, Addition
Conception
$1,700,000 est. value
Leander, TX 78641

Last Updated 02/13/2023 12:11 PM
Project Title

Public Safety Training Facility - Phase 1- F76 - City of Cedar Park

Physical Address View project details and contacts
City, State (County) Cedar Park, TX 78613   (Williamson County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $28,982,644 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Joint training facility for Police, Fire and Emergency Management to conduct training activities, located on land currently owned by the City. Would include admin/classroom building with Emergency Operations Center, shared training rooms, offices, locker room, showers, apparatus bays and necessary site development. This project is included in the city's FY 2023-2028 Capital Improvement Program. As of February 13, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents