Similar Projects
Fairview Road - Los Viboras Road to Aquistapace Road - San Benito County
Alteration
Conception
$363,950 est. value
Hollister, CA 95023

Wright Road - Buena Vista Road To 1 Mile East - Pwb2102 - San Benito County
Alteration
Conception
$2,650,000 est. value
Hollister, CA 95023

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Construct a New Interchange at Castroville Boulevard and Highway 156
Alteration
Design
$25,000,000 est. value
San Juan Bautista, CA 95045

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Parking Lot Sweep and Steam Cleaning at the Hollister DMV Field Office.
Term Contract, Infrastructure, Alteration
Post-Bid
$41,184 est. value
Hollister, CA 95023

SB1 Road Maintenance Projects at Various Locations, FY 2020-2021
Infrastructure
Results
Hollister, CA

Construct roundabout
Infrastructure
Results
$9,000,000 est. value
CA

Felipe Nine
New Construction, Infrastructure - 337,710 SF
Pending Verification
$118,000,000 CJ est. value
Hollister, CA 95023

Felipe Nine
New Construction, Infrastructure - 337,710 SF
Pending Verification
$118,000,000 CJ est. value
Hollister, CA 95023

New Idria Road Crossing - San Benito County
Infrastructure
Conception
$470,000 est. value
Idria, CA

Rocks Road Bridge Replacement Over Tres Pinos Creek - RF 33-705 - San Benito County
New Construction, Demolition, Infrastructure
Design
$3,104,000 est. value
San Juan Bautista, CA 95045

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Widening Highway From 2-Lane to 4-Lane Controlled Access Highway
Infrastructure
Results
$55,000,000 est. value
CA

Cole Road to South Ricardo to North Ricardo to Anzar Road - PWB-2105 - San Benito County
Infrastructure
Conception
$674,844 est. value
Aromas, CA

Last Updated 09/14/2022 11:01 AM
Project Title

Cienega Road - Mudstone Ranch to Bird Creek - San Benito County

Physical Address View project details and contacts
City, State (County) Hollister, CA 95023   (San Benito County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $807,790 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined Project is included in the County of San Benito's FY2022 - 2023 Budget CIP. As of September 14, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated in 2022/2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents