Similar Projects
Saint Louis Zoo WildCare Park Conservation and Safari Barn Shells
New Construction, Infrastructure
Design
$300,000 CJ est. value
Saint Louis, MO 63138

Demolition Work for New Administration Building
Demolition, Infrastructure
Design
$600,000 CJ est. value
Saint Louis, MO 63103

Whetstone Creek CA - Big Lake Spillway Structure Replacement
Infrastructure
Bidding
$450,000 CJ est. value
Williamsburg, MO 63388

Demolition and Clean-up of Six (6) Structures
Demolition, Infrastructure
Bidding
$50,000 CJ est. value
Cape Girardeau, MO 63701

University of Missouri Teaching Hospital - Normal Power Upgrade Phase 2, Distribution Panels
Renovation
Sub-Bidding
$560,920 CJ est. value
Columbia, MO 65203

490 Kingshighway - Holland Construction Services
Demolition
Sub-Bidding
$100,000 CJ est. value
Saint Louis, MO 63108

Asbestos Abatement and Building Demolition
Demolition, Alteration
Post-Bid
Joplin, MO

Gotsch Intermediate School - Asbestos Abatement Service
Alteration
Post-Bid
Affton, MO 63123

Asbestos Removal
Alteration
Results
Joplin, MO 64804

Former Jamestown Mall - Environmental Abatement
Alteration
Results
Florissant, MO 63034

Tree Planting and Forestry Services
Term Contract
Design
West Alton, MO 63386

RFQ - Environmental Consulting Services
Term Contract
Bidding
Saint Louis, MO 63103

Demolition Frederick Avenue
Demolition, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Saint Joseph, MO 64501

Environmental Remediation Services
Term Contract
Post-Bid
Kirkwood, MO

Asbestos Removal at old bank building
Alteration
Results
Poplar Bluff, MO

Last Updated 04/25/2023 01:04 PM
Project Title

Oak Hill Demolition

Physical Address View project details and contacts
City, State (County) Belton, MO 64012   (Cass County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $39,400 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of the apartment buildings located following the removal of asbestos and other hazardous materials from the property. Work includes the removal from the work site of all debris and material. Requests for information related to this RFP should be directed to: Andrew Niiro, Engineer I Telephone: (816) 892-1293 E-Mail: aniiro@belton.org The Site consists of two approximately 4,992 square foot (ft2) single story apartment buildings constructed in 1965. Each building contains eight residential units comprised of a main living room, kitchen area with one bathroom, and one bedroom. The buildings are concrete slab-on grade wood and concrete block construction with shingle covered gable style roof. A crawl space is present above the slab and extends the length of the building. The Interior of the building consists of wood paneling on wood framed walls with plywood flooring covered by areas of carpet, exposed plywood and sheet flooring, except for Rooms 104 and 111, which contain drywall and ceilings. The exterior is constructed of wood materials.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents