Similar Projects
Last Updated | 11/09/2020 11:17 AM |
Project Title | Celeste Circle Lift Station Improvements |
Physical Address | View project details and contacts |
City, State (County) | Durham, NC 27701 (Durham County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $171,940 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project Scope of Work shall be to install a new bypass force main, approximately 60-ft in length, connecting to a new precast doghouse manhole, in order to divert flow from the Celeste Lift Station to the South Durham Water Reclamation Facility. Once bypass is complete, remove existing wet well top slab, repair top of wet well wall, then rehabilitate existing wet well interior walls with structural cementitious liners, and provide a new top slab with new hatches. The project is located at the Celeste Circle Lift Station at 6000 George King Road, near the intersection with the NC 54 Service Road. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |