Similar Projects
RFP - Anchor Point Road MP 0-1.3 Pavement Preservation Surveying and Mapping Services
Term Contract
Conception
$100,000 CJ est. value
Anchor Point, AK 99556

RFQ - Kachemak Drive MP 0-3.5 Pavement Preservation Surveying and Mapping Services
Term Contract
Conception
$200,000 CJ est. value
Homer, AK 99603

Lowell Creek Flood Diversion - US Army Corps of Engineers - Alaska District
Infrastructure
Design
$185,225,000 CJ est. value
Seward, AK 99664

RFP Design - Achemak Selo School Schematic Design
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Fritz Creek, AK 99603

Sterling Highway Mp 45-60 Sunrise to Skilak Lake Rd Reconstruction CM/GC
Infrastructure
Post-Bid
$1,000,000 to $2,500,000 est. value
AK

Gravel Road Design - Duke Street, St. Andrews Road; Sports Lake Road; Hakala Drive; Cotman Court
Infrastructure
Results
$86,011 est. value
Soldotna, AK 99669

Basargin Road Phase 3 Design
Infrastructure
Results
English Bay, Soldotna, AK 99669

Seward Highway Milepost 25.5-36 Rehabilitation Project - Alaska Department of Transportation
Infrastructure
Pending Verification
$50,000,000 CJ est. value
Moose Pass, AK 99631

Seward Highway Milepost 25.5-36 Rehabilitation Project - Alaska Department of Transportation
Infrastructure
Pending Verification
$50,000,000 CJ est. value
Moose Pass, AK 99631

Terminal Road And Parking Lot Improvements - City of Kenai
Infrastructure
Conception
$1,750,000 CJ est. value
Kenai, AK 99611

Salmon Creek Channel Excavation and Embankment Maintenance
Infrastructure
Post-Bid
$500,000 CJ est. value
Seward, AK 99664

Rehabilitate the Seward Highway from Mp 17 to 22.5
Infrastructure
Results
$60,000,000 to $70,000,000 est. value
Seward, AK

Sterling Highway MP 45-60: Sunrise to Skilak lake Rd; Stage 1B - State of Alaska Department
Infrastructure
Pending Verification
$40,000,000 CJ est. value
Kenai, AK 99611

Apron And Willow Street Extension - City Of Kenai
Infrastructure
Conception
$2,350,000 CJ est. value
Kenai, AK 99611

Summer and Winter Road Maintenance - South Region, Units 3, 4, 7, 8 and 9
Term Contract
Post-Bid
Soldotna, AK 99669

Last Updated 03/30/2023 01:39 PM
Project Title

West Hill Road Pavement Preservation

Physical Address View project details and contacts
City, State (County) Homer, AK 99603   (Kenai Peninsula County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,992,940 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Federal# / IRIS Program#: 0001599 / CFHWY00300 Region: Central Region This federally funded project will resurface the West Hill Road from the Sterling Highway to Skyline Drive. Project work includes drainage, signing, striping, dig-outs, curb ramps, guardrail, and paving. On the Job Trainees/Apprentices (item 645): 0 Trainee(s), 0 Hours Engineer's Estimate Range: Between $2,500,000 and $5,000,000 The Project completion date will be September 30, 2022. Plans, Specs, Bid Packets and Addenda along with other additional information pertaining to the project may now be downloaded in their entirety at no charge from the Department's approved online bidding service website. From the DOT&PF website, your company must self-register by clicking on the Plan Holders link, or register with the Central Region Plans Room, or your bid may not be accepted. Individuals with disabilities, including the hearing impaired, who may need auxiliary aids, services, and/or special modifications to submit a bid/proposal should contact the TTD number: (907) 269-0473, no later than one week prior to the submittal date to make any necessary arrangements. AKDOT - West Hill Road Pavement Preservation *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents