Similar Projects
Camp Street and West Washington Street Resurfacing
Infrastructure
Bidding
$200,000 CJ est. value
East Peoria, IL 61611

Camp Street and West Washington Street Resurfacing
Infrastructure
Bidding
$200,000 CJ est. value
East Peoria, IL 61611

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Campus Pavement Replacement Phase V Life Safety Improvements
Infrastructure
Post-Bid
East Peoria, IL

2021 Spray Patching
Term Contract, Infrastructure
Results
IL

Road Patching, Milling and Seal Coat
Results
Washington, IL

2021 North Pekin Chip Seal
Infrastructure
Post-Bid
North Pekin, IL

Realignment, Pavement Reconstruction, Culvert Extensions, Culverts and Pavement Markings
Infrastructure
Results
Pekin, IL

Material Quotations Only - 400 Tons of HMA Surface Course; 200 Tons of Bituminous Premix (Cold Patch)
Alteration
Post-Bid
Pekin, IL

Construction of a PCC multi-use path and drainage items along Centennial Drive from Spring Creek Road
Infrastructure
Results
Washington, IL

Bituminous Surface Treatment
Infrastructure
Post-Bid
Tremont, IL

Patching on IL Route 116 from IL Route 26 to East of Lourdes Road in Germantown Hills
Infrastructure
Results
Germantown Hills, IL

Mineral Springs Park Restroom
New Construction, Infrastructure
Post-Bid
Pekin, IL 61554

Patching
Infrastructure
Results
IL 61721

Second Street HMA Resurfacing
Infrastructure
Post-Bid
Hopedale, IL 61747

Last Updated 10/19/2022 07:33 PM
Project Title

Fairlane Drive Pavement Patching Plan Marina Lane to Uftring Ford

Physical Address View project details and contacts
City, State (County) East Peoria, IL 61611   (Tazewell County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $239,924 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of October 19, 2022, this project has been awarded to Knapp Concrete Contractors, Inc., in the amount of $239,924.20. All bidders are hereby advised that they must be able submit an Illinois Department of Transportation Pre-qualification Statement for this Project prior to opening of Bids. Bids will be held good and may not be withdrawn for a period of 60 calendar days from the due date. Every bid shall consist of two (2) completed copies of Bid Documents and shall be accompanied by bid guarantee consisting of bid bond, certified check or cashier's check made payable to City of East Peoria, in amount of five percent of total of bids upon which Contractor is bidding. Failure of bidder to submit bid bond, certified check or cashier's check in amount to cover proposals bid upon is cause for rejection of this bid. Commencement of the work on the project may begin as early as November 2nd, 2022. The project shall be substantially completed on or before April 30th, 2023. Owner reserves the right to waive any irregularities and to accept any or reject all bids when in the opinion of Owner, such action will serve the best interest of Owner. Bids on all work of this contract shall be subject to the provisions of the "Illinois Prevailing Wage Act" (820 ILCS 130/1, et seq.).

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents