Similar Projects
Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

2021 Street Maintenance
Post-Bid
Oconomowoc, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Menomonee Park DEA Asphalt and Concrete Paving
Results
Menomonee Falls, WI 53051

2021 Local Road Maintenance
Post-Bid
WI

Montello - Wautoma, Marquette Co. Line/CTH JJ - STH 21
Results
Marquette, Montello, Wautoma, WI 54970

2021 Road Program
Post-Bid
Brookfield, WI 53045

Adelaide and TRU Storm Sewer
Results
Brookfield, WI 53005

Street Median Island Mowing and Trimming Services
Term Contract
Post-Bid
Waukesha, WI 53186

Hillendale Drive Reconstruction
Results
Muskego, WI 53150

2021 Road Improvement Program
Post-Bid
Delafield, WI

2021 Street Projects 47
Results
Less than $2,000,000 est. value
Oconomowoc, WI

Road Paving
Post-Bid
WI 53066

IH 43, Rock Freeway, 124th Street and 116th Street Br.; IH 43, Rock Freeway, STH 83 to STH 164; IH 43, Rock Freeway, STH 164 to Beloit Road
Results

Median Grass Mowing on Highway 67
Post-Bid
Oconomowoc, WI 53066

Last Updated 07/21/2021 05:00 PM
Project Title

Construct East Perimeter Road

Physical Address View project details and contacts
City, State (County) Waukesha, WI   (Waukesha County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Landscaping, Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid: Clearing and Grubbing, 1 LS; Common Excavation, 42,000 CY; Remove Asphalt, 520 SY; Remove Chain Link Fence, 1650 LF; Geotextile Fabric, 14,000 SY; Chain Link Fence, 1,800 LF; Concrete Flume, 690 LF; Landscaping, 42,000 SY; Base Course, 7,700 TON; Breaker Run, 11,500 TON; Asphalt, 2,800 TON, Pavement Marking, 1,300 LF; Storm Sewer, 100 LF Alternate A:Clearing and Grubbing, 1 LS; Common Excavation, 3,500 CY, Remove Asphalt, 250 SY; Geotextile Fabric, 3,350 SY; Storm Sewer, 50 LF; Landscaping, 5,000 SY; Base Course, 1,500 TON; Breaker Run, 2,600 TON; Asphalt, 600 TON; Pavement Marking, 300 LF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents