Similar Projects
Dr. Martin Luther King Jr. Park Addition
Addition
Conception
$8,500,000 est. value
Modesto, CA

Health Center - California State University - Stanislaus
New Construction, Infrastructure - 15,600 SF
Conception
$27,773,000 CJ est. value
Turlock, CA 95382

Beautification Clean California Project
Infrastructure
Design
$1,250,000 CJ est. value
Ceres, CA 95307

Rebid Upgrade Traffic Signals - 2017
Infrastructure
Bidding
$475,354 CJ est. value
Modesto, CA 95354

Washington Road Bridge Railing Repair
Infrastructure
Bidding
$138,000 CJ est. value
Turlock, CA 95380

Tuolumne River Regional Park (TRRP) Master Plan Update
New Construction
Post-Bid
$275,000 est. value
Modesto, CA

Revard Park Playground Replacement
Renovation
Post-Bid
$25,000 est. value
Modesto, CA

Backflow Testing and Emergency Repairs
Infrastructure
Results
Modesto, CA 95354

Salado Creek Bike Trail Project
Renovation
Results
$2,198,000 est. value
Patterson, CA 95363

Grower Direct Nut Warehouse Addition / Stanislaus County
Addition, New Construction, Infrastructure - 305,500 SF
Pending Verification
$32,000,000 CJ est. value
Hughson, CA 95326

Pirrone Road Mixed Use Development
New Construction, Infrastructure - 72,932 SF
Pending Verification
$10,000,000 CJ est. value
Salida, CA 95368

Parking Structure - California State University - Stanislaus
New Construction, Infrastructure
Conception
$17,827,000 CJ est. value
Turlock, CA 95382

F Street Pedestrian Improvements
Infrastructure
Bidding
$282,000 CJ est. value
Waterford, CA 95386

Construction Management Services for La Loma Phase 2C Strengthen and Replace Water Mains
Infrastructure
Post-Bid
$1,000,000 est. value
Modesto, CA

Ralston Tower Park
Renovation
Results
Modesto, CA

Last Updated 09/13/2022 02:49 PM
Project Title

Baseball Field Backstop Project

Physical Address View project details and contacts
City, State (County) Hughson, CA 95326   (Stanislaus County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Hughson is looking to Replace the existing back stop and dugouts at the north/east corner of Lebright Field along Charles St. Project Scope: 1) The contractor shall be responsible for the demolition and disposal of all existing structures, Including, but not limited to, the back stop, dugouts, all fencing presently aligned with the backstop and concrete. 2) All new fencing materials will be 9 ga chain link, vinyl coated, materials. All posts and hardware will be vinyl coated where possible. 3) Vertical posts will be 6" schedule 40, galvanized pipe. Cross piping supports shall be no less than 1 1/4 " schedule 40 galvanized pipe or larger. 4) The contractor shall supply and erect new backstop and dugouts aligning with the residential wall, approximately 20-feet off the wall and approximately 15-feet off and along the existing 3rd Street sidewalk. 5) The back stop will be 16-feet wide by 20-feet-tall. The backstop will have an appropriate overhang, to help control foul balls, that will merge with the first 20-foot section on each side of the fence run. 6) Coming off each side of the backstop will be a 20-foot-high fence that is 40 feet long. 7) Attached to that fencing section on each side of the diamond will be a 12-foot-high by 40-footlong section of fence that will contain 12-foot-tall, 30-foot-long by 6-foot-wide dugouts on each outside run of the diamond fence. There will be a 4-foot opening, to the field, at the home plate end and an open end at the opposite end of the dugout. The dugout will be covered with fencing material for foul ball protection. The dugout will have a 4" minimum thick concrete floor. 8) The contractor shall be responsible to provide all materials, labor and equipment needed to complete this scope. 10) The contractor shall be responsible for the protection of any materials or equipment left on site during non-working hours. 11) The contractor shall be responsible for the proper disposal of any project waste. 12) The contractor shall be responsible for any required building permits and inspections. Permit fees will be waived by the City. 13) The contractor shall have a C-13 license, provide their DIR number and proof of insurance per City requirements. 14) According to contracting law, the contractor shall provide payment and performance bonds on work totaling $25k or more. 17) The City would like this project completed by mid-November, if possible. 18) Any questions, please contact Bill Newlin at 209-617-7850 or Jose Vasquez at 209-505-3049. ADD ALT#1: The contractor shall duplicate this scope at the south/east field. Placement shall be determined if awarded. Pricing is to be a separate line item.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents