Similar Projects
Traffic Line and Specialty Roadway Markings
Bidding
East Longmeadow, MA

Painting oTraffic Lines
Bidding
$35,000 est. value
East Longmeadow, MA

Statewide Airport Pavement Maintenance Project
Post-Bid
Less than $1,500,000 est. value

2020 Pavement Markings Contract for Department of Public Works
Post-Bid
Less than $165,000 est. value
Springfield, MA

Application of Reflectorized Pavement Markings at Various Locations
Results
Less than $872,000 est. value

Application of Reflectorized Pavement Markings at Various Locations
Results
Less than $700,000 est. value

Scheduled and Emergency Guardrail and Fence Repairs and Improvements at Various Locations
Results
Less than $174,000 est. value

Furnishing and Installing Overhead and Ground Mounted Guide and Traffic Signs along a Section of Interstate 391 and Sections of Route 33
Results
Less than $1,893,817 est. value
Chicopee, Holyoke, MA 01040

LPR Signage Civil Work
Results
Less than $45,000 est. value
Springfield, MA 01105

Scheduled and Emergency Impact Attenuator Repairs at Various Locations
Results
Less than $64,840 est. value

Installation of Pavement Markings on Parkways
Results
Less than $1,300,000 est. value

Line Striping and Pavement Markings
Results
Less than $55,000 est. value
Agawam, MA

2020 Traffic Markings
Results
Less than $84,000 est. value
West Springfield, MA

Maintain Pavement Markings, Airfield
Results
$100,000 to $250,000 est. value
Chicopee, MA 01022

Conversion of Interstate and Freeway Exit Signs to Milepost-Based Numbering
Results
Less than $908,675 est. value

Last Updated 02/05/2020 12:32 PM
Project Title

Guardrail Repairs and Replacements and Related Work along a Section of Interstate 90

Physical Address View project details and contacts
City, State (County) Palmer, Wilbraham, MA 01069   (Hampden County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,463,245
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $32,500","100." "3100.000","Cy","Earth Excavation","120." "720.000","Cy","Unclassified Excavation","120.1" "10.000","Cy","Class a Rock Excavation","121." "5.000","Cy","Class a Trench Excavation","141." "50.000","Cy","Test Pit For Exploration","141.1" "2.000","Cy","Class b Rock Excavation","144." "980.000","Cy","Gravel Borrow","151." "600.000","Cy","Gravel Borrow - Type c","151.01" "10.000","Ton","Crushed Stone","156." "18100.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "3.000","Ton","Disposal Of Treated Wood Products","184.1" "63.000","Ea","Drainage Structure Adjusted","220." "7.000","Ft","Drainage Structure Rebuilt","220.2" "70.000","Ea","Large Hook Lock Bar Grate – Furnished And Installed","222.4" "70.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "40.000","Cy","Removal Of Drainage Structure Sediment","227.3" "5400.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "2500.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "12400.000","Ft","Pavement Milling Mulch For Shoulders","402.13" "170200.000","Sy","Pavement Micromilling","415." "26715.000","Lb","Calcium Chloride For Roadway Dust Control","440." "18.000","Mgl","Water For Roadway Dust Control","443." "23900.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - p)","450.231" "6700.000","Ton","Hma For Patching","451." "12000.000","Gal","Asphalt Emulsion For Tack Coat","452." "107800.000","Ft","Hma Joint Sealant","453." "10.000","Ton","Hot Mix Asphalt Berm, Type a","470." "30.000","Ton","Asphalt Mixtures For Temporary Work","472." "35620.000","Ft","Milled Rumble Strip","477." "165.000","Ft","Edging Removed And Discarded","597." "27000.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "100.000","Ft","Guardrail, Tl-3 (Double Faced)","621.13" "12.000","Ea","Trailing Anchorage","627.1" "4.000","Ea","Steel Thrie Beam Terminal Section (Single Faced)","627.3" "1.000","Ea","Guardrail End Treatment, Tl-3 (Double Faced)","627.73" "5.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "4.000","Ea","Guardrail Flared End Treatment, Tl-3","627.93" "1.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "9.000","Ea","Transition To Rigid Barrier (Single Faced)","628.22" "7.000","Ea","Transition To Rigid Barrier (Double Faced)","628.23" "8.000","Ea","Transition To Bridge Rail","628.24" "2.000","Ea","Transition To Thrie Beam","628.25" "4.000","Ea","Transition To Bridge Rail - Double Faced","628.26" "1.000","Ea","Transition To Nchrp 350 Guardrail (Double Faced)","628.27" "1250.000","Ft","Precast Concrete Barrier - Single Faced","629.1" "120.000","Ft","Precast Concrete Barrier –Single Faced (42” Tall)","629.13" "20.000","Ft","Precast Concrete Barrier –Single Faced (32” To 42” Tall Transition)","629.14" "150.000","Ft","Precast Concrete Median Barrier - Double Faced","629.2" "180.000","Ft","Cast-In-Place Concrete Median Barrier - Double Faced","629.4" "24.000","Cy","Cast-In-Place Median Barrier Cap","629.5" "80.000","Ft","Concrete Barrier Double Face Removed And Discarded","629.7" "27900.000","Ft","Highway Guard Removed And Discarded","630.2" "12.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "1000.000","Cy","Loam Borrow","751." "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "8900.000","Sy","Seeding","765." "58900.000","Ft","Sediment Control Barrier","767.121" "8900.000","Sy","Straw Mulch","767.31" "2850.000","Sy","Jute Mesh Erosion Control Fabric","767.731" "27500.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "22250.000","Ft","Excavating, Re-Grading And Shaping Median","769.3" "96.000","Sf","Warning-Regulatory And Route Marker - Aluminum Panel (Type a)","832." "22.000","Ea","Delineation For Guard Rail Termini","833.7" "4.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "400.000","Day","Traffic Cones For Traffic Management","851.1" "1000.000","Sf","Safety Signing For Traffic Management","852." "29400.000","Ft","Temporary Barrier Removed And Reset","853.21" "5280.000","Ft","Temporary Barrier (Tl-3)","853.23" "2800.000","Ft","Temporary Barrier - Limited Deflection (Tl-3)","853.33" "200.000","Day","Truck Mounted Attenuator","853.403" "6.000","Ea","Temporary Impact Attenuator Removed And Reset","853.501" "4.000","Ea","Temporary Impact Attenuator Unidirectional, Non-Redirective (Tl-3)","853.53" "1.000","Ea","Temporary Impact Attenuator Unidirectional, Redirective (Tl-3)","853.63" "200.000","Day","Temporary Illumination For Work Zone","853.8" "126700.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "10700.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "18500.000","Sf","Pavement Marking Removal","854.1" "200.000","Day","Temporary Portable Rumble Strips","854.6" "800.000","Day","Arrow Board","856." "800.000","Day","Portable Changeable Message Sign","856.12" "110000.000","Day","Reflectorized Drum","859." "600.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "1800.000","Ea","Slotted Pavement Marker One-Way White","864.31" "54000.000","Ft","6 Inch Wet Reflective Recessed White Line (Polyurea)","868.206" "190.000","Ft","12 Inch Wet Reflective Recessed White Line (Polyurea)","868.212" "35710.000","Ft","6 Inch Wet Reflective Recessed Yellow Line (Polyurea)","869.206" "20.000","Ea","Traffic Sign Removed And Reset","874.2"

Details

Division 02 - Existing Conditions, Snow Control, Snow Fencing.
Division 34 - Transportation, Guideways/Railways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents