Similar Projects
Y1DZ--Chiller Plant construction-Erie VAMC Project Number 562-14-115
Design
$5,000,000 to $10,000,000 est. value
Erie, PA

RSW WTP Phase 3 Facility Improvements Project Contract - General Construction
Renovation
Bidding
$12,200,000 est. value
Erie, PA 16507

Water Filtration Plant
New Construction - 27,000 SF
Bidding
Aliquippa, PA

Construction of the Loysville Inflow and Infiltration Project
Post-Bid
Loysville, PA 17047

Glendale Valley Municipal Authority Dutch Run Oval Wastewater Extension
Post-Bid
Flinton, PA 16640

Moving Bed Biological Reactor Maintenance
Results
Chambersburg, PA 17201

Wastewater Treatment Plant Operations Building Laboratory Renovations And Improvements
Results
Hollidaysburg, PA

Treatment Building Upgrade Project
Renovation - 320 SF
Construction
$206,800 est. value
Waterville, PA 17776

Wastewater Treatment Plant Improvements
Renovation
Construction
Pocono Lake, PA 18347

Indian Run Water Treatment Plant Upgrade - General Construction, Instrumentation and Controls/Electrical Construction
Bidding
$1,300,000 est. value
Pottsville, PA

Allegheny National Forest - Wastewater Treatment Plant Operation
Post-Bid
Bradford, PA 16701

Water Treatment Improvements Project - General/Mechanical
Results
Less than $1,318,898 est. value
Williamsburg, PA

Pretreatment Building Restoration at Queen Lane WTP
Renovation
Construction
$5,000,000 est. value
Philadelphia, PA 19129

Prison Bioxide System Installation
Renovation
Bidding
Connellsville, PA

Wastewater Treatment Plant Expansion Project
Post-Bid
Mars, PA 16046

Reported 02/17/2020 10:47 AM
Project Title

2020 Independence Park Water Treatment Plant Upgrade

Physical Address View project details and contacts
City, State (County) Clinton, PA 15026   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value Less than $500,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project more or less consists of construction of a 15' x 20' filter building, installation of the new filter system including filters, piping, tanks and all appurtenances and installation of water and electric lines to an existing well

Details

Water Treatment Plant, 300 SF New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings.
Division 22 - Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 33 - Utilities, Water Utilities, Disinfecting of Water Utility Distribution, Wastewater Utility Pumping Stations, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents