Similar Projects
Complete Streets Improvements Along Eastern Avenue and East Street
Bidding
Dedham, MA 02026

On Call Parking and Paving (CR)
Bidding
$25,000,000 est. value
Boston, MA

Permanent Trench Patch Repair
Term Contract
Post-Bid
Less than $151,755 est. value
Braintree, Cohasset, Duxbury, Hanover, Hingham, Hull, Marshfield, Milton, Norwell, Pembroke, Scituate, MA

Roadway Management
Post-Bid
Less than $151,755 est. value
Braintree, Cohasset, Duxbury, Hanover, Hingham, Hull, Marshfield, Milton, Norwell, Pembroke, Scituate, MA 02111

Capital Improvement Project 19-22 - Traffic Signal and Roadway Improvements in Readville
Results
Readville, MA

Asphalt Rubber Surface Treatment at Various Locations
Results
Less than $303,360 est. value
Walpole, MA

Unlikely Story Bookstore Parking Lot Expansion
Pending Verification
Plainville, MA

North Hill Needham - Site Plan Improvements
New Construction
Pending Verification
Needham, MA 02492

Repair and Maintenance of DCR Hard Courts Including: Milling and Resurfacing
Bidding
$1,200,000 est. value
Boston, MA

Road Repair, Bituminous and Concrete Repair, Catch Basin and Manhole Adjustments
Term Contract
Post-Bid
Less than $200,000 est. value
Medway, MA 02053

Roadway Surface Sealing Treatment - Asphalt Rubber Surface Treatment
Term Contract
Results
$239,237 est. value
Ashland, Millis, Natick, Sherborn, Southborough, Wellesley, MA

FY22 Annual Road Resurfacing
Bidding
Norwood, MA

Asphalt Paving and Patching
Term Contract
Post-Bid
Medway, MA 02053

Crack Sealing
Results
Less than $507,837 est. value
Braintree, Cohasset, Duxbury, Hanover, Hingham, Hull, Marshfield, Milton, Norwell, Pembroke, Scituate, Wellesley, MA

Town Center Intersection Improvements
Bidding
$2,000,000 est. value
Bellingham, MA

Last Updated 03/31/2021 12:46 PM
Project Title

Roadway Reconstruction (Including Bridge Replacement, Culvert Extension and Signals) Along A Section of Route 1A (Main Street)

Physical Address View project details and contacts
City, State (County) Walpole, MA 02081   (Norfolk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,101,404
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Pre And Post Construction Survey And Settlement/Displacement Monitoring At Bridge No. w-03-013","100.92" "0.350","a","Clearing And Grubbing","101." "2400.000","Ft","Tree Trimming","102.1" "116.000","Ea","Tree Protection – Armoring & Pruning","102.511" "18.000","Ea","Tree Removed - Diameter Under 24 Inches","103." "10.000","Ea","Tree Removed - Diameter 24 Inches And Over","104." "7.000","Ea","Stump Removed","105." "1.000","Ls","Demolition Of Superstructure Of Bridge No. w-03-024","114.1" "31000.000","Cy","Unclassified Excavation","120.1" "36.000","Cy","Reinforced Concrete Excavation","127.1" "5500.000","Cy","Reinforced Concrete Roadway Base Excavation","127.2" "1540.000","Cy","Bridge Excavation","140." "816.000","Cy","Class a Trench Excavation","141." "190.000","Cy","Test Pit For Exploration","141.1" "4500.000","Cy","Class b Trench Excavation","142." "750.000","Cy","Class b Rock Excavation","144." "75.000","Ea","Drainage Structure Removed","146." "20150.000","Cy","Gravel Borrow","151." "12.000","Cy","Gravel Borrow For Bridge Foundation","151.1" "2350.000","Cy","Gravel Borrow For Backfilling Structures And Pipes","151.2" "18.000","Cy","Controlled Density Fill - Non-Excavatable","153.1" "550.000","Ton","Crushed Stone","156." "4.000","Ton","Crushed Stone For Bridge Foundations","156.1" "62.000","Ton","Crushed Stone For Integral Abutment Piles","156.13" "90.000","Cy","Gabions","157.1" "66000.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ls","Environmental Health And Safety Program","180.01" "400.000","Hr","Personal Protection Level c Upgrade","180.02" "400.000","Hr","Licensed Site Professional Services","180.03" "100.000","Ton","Disposal Of Unregulated Soil","181.11" "66.000","Ton","Disposal Of Regulated Soil - In-State Facility","181.12" "60.000","Ton","Disposal Of Regulated Soil - Out-Of-State Facility","181.13" "40.000","Ton","Disposal Of Hazardous Waste","181.14" "1.000","Ls","Inspection And Testing For Asbestos","182.1" "250.000","Ft","Removal Of Asbestos","182.2" "2000.000","Gal","Treatment Of Contaminated Groundwater","183.1" "250.000","Lb","Disposal Of Granular Activated Carbon","183.2" "1.000","Ton","Disposal Of Treated Wood Products","184.1" "184.000","Ea","Catch Basin","201." "107.000","Ea","Manhole","202." "10.000","Ea","Manhole (9 To 14 Foot Depth)","202.2" "17.000","Ea","Manhole (5 Foot Diameter)","202.5" "2.000","Ea","Manhole (6 Foot Diameter)","202.6" "1.000","Ea","Special Manhole","203.1" "11.000","Ea","Special Gutter Inlet","204.1" "1.000","Ea","Sanitary Sewer Manhole","210." "3.000","Ea","Sanitary Sewer Manhole Removed","210.02" "377.000","Ea","Drainage Structure Adjusted","220." "20.000","Ft","Drainage Structure Rebuilt","220.2" "1.000","Ea","Drainage Structure Change In Type","220.3" "4.000","Ea","Drainage Structure Remodeled","220.5" "20.000","Ft","Sanitary Structure Rebuilt","220.6" "40.000","Ea","Sanitary Structure Adjusted","220.7" "15.000","Ea","Sanitary Structure Remodeled","220.8" "3.000","Ea","Sanitary Structure Abandoned","220.9" "150.000","Ea","Frame And Cover","221." "190.000","Ea","Frame And Grate (Or Cover) Municipal Standard","222.3" "76.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "62.000","Cy","Removal Of Drainage Structure Sediment","227.3" "880.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "105.000","Sf","Masonry Plug","227.4" "650.000","Ft","10 Inch Ductile Iron Pipe","238.10" "285.000","Ft","12 Inch Ductile Iron Pipe","238.12" "2550.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "1650.000","Ft","15 Inch Reinforced Concrete Pipe","241.15" "1600.000","Ft","18 Inch Reinforced Concrete Pipe","241.18" "990.000","Ft","24 Inch Reinforced Concrete Pipe","241.24" "1020.000","Ft","30 Inch Reinforced Concrete Pipe","241.30" "2.000","Ea","12 Inch Reinforced Concrete Pipe Flared End","242.12" "2.000","Ea","18 Inch Reinforced Concrete Pipe Flared End","242.18" "2.000","Ea","24 Inch Reinforced Concrete Pipe Flared End","242.24" "1.000","Ea","30 Inch Reinforced Concrete Pipe Flared End","242.30" "1305.000","Ft","12 Inch Reinforced Concrete Pipe Class Iv","243.12" "400.000","Ft","15 Inch Reinforced Concrete Pipe Class Iv","243.15" "93.000","Ft","18 Inch Reinforced Concrete Pipe Class Iv","243.18" "180.000","Ft","24 Inch Reinforced Concrete Pipe Class Iv","243.24" "910.000","Ft","12 Inch Reinforced Concrete Pipe Class v","244.12" "660.000","Ft","18 Inch Reinforced Concrete Pipe Class v","244.18" "640.000","Ft","24 Inch Reinforced Concrete Pipe Class v","244.24" "195.000","Ft","30 Inch Reinforced Concrete Pipe Class v","244.30" "200.000","Ft","6 Inch Polyvinyl Chloride Sanitary Sewer Pipe","250.06" "35.000","Ft","8 Inch Polyvinyl Chloride Sanitary Sewer Pipe","250.08" "20.000","Ft","21 Inch Polyvinyl Chloride Sanitary Sewer Pipe","250.21" "56.000","Sy","Stone For Drainage Outlets","258.1" "20.000","Ft","4 Inch Ductile Iron Water Pipe (Mechanical Joint)","303.04" "730.000","Ft","6 Inch Ductile Iron Water Pipe (Mechanical Joint)","303.06" "300.000","Ft","8 Inch Ductile Iron Water Pipe (Mechanical Joint)","303.08" "810.000","Ft","12 Inch Ductile Iron Water Pipe (Mechanical Joint)","303.12" "6720.000","Lb","Ductile Iron Fittings For Water Pipe","309." "20.000","Ft","4 Inch Water Main Removed And Stacked","315.04" "350.000","Ft","6 Inch Water Main Removed And Stacked","315.06" "420.000","Ft","8 Inch Water Main Removed And Stacked","315.08" "680.000","Ft","12 Inch Water Main Removed And Stacked","315.12" "190.000","Ft","3/4 Inch Copper Tubing Type k","347.075" "190.000","Ft","1 Inch Copper Tubing Type k","347.1" "190.000","Ft","1-1/4 Inch Copper Tubing Type k","347.125" "140.000","Ft","1-1/2 Inch Copper Tubing Type k","347.15" "190.000","Ft","2 Inch Copper Tubing Type k","347.2" "5.000","Ea","6 Inch Gate And Gate Box","350.06" "2.000","Ea","8 Inch Gate And Gate Box","350.08" "3.000","Ea","12 Inch Gate And Gate Box","350.12" "14.000","Ea","6 Inch Gate And Gate Box Removed And Stacked","355.06" "2.000","Ea","8 Inch Gate And Gate Box Removed And Stacked","355.08" "2.000","Ea","12 Inch Gate And Gate Box Removed And Stacked","355.12" "14.000","Ea","6 Inch Gate Box","357.06" "14.000","Ea","8 Inch Gate Box","357.08" "14.000","Ea","12 Inch Gate Box","357.12" "181.000","Ea","Gate Box Adjusted","358." "5.000","Ea","Gate Box Removed And Stacked","358.1" "4.000","Ea","Monitoring Well Adjusted","358.2" "10.000","Ea","3/4 Inch Corporation Cock","363.075" "10.000","Ea","1 Inch Corporation Cock","363.1" "10.000","Ea","1-1/4 Inch Corporation Cock","363.125" "10.000","Ea","1-1/2 Inch Corporation Cock","363.15" "10.000","Ea","1-3/4 Inch Corporation Cock","363.175" "10.000","Ea","2 Inch Corporation Cock","363.2" "5.000","Ea","6 Inch Cast Iron Plug","367.06" "8.000","Ea","8 Inch Cast Iron Plug","367.08" "2.000","Ea","12 Inch Cast Iron Plug","367.12" "1.000","Ea","8 x 6 Inch Tapping Sleeve, Valve And Box","370.1" "5.000","Ea","12 x 6 Inch Tapping Sleeve, Valve And Box","370.4" "10.000","Ea","4 Inch Coupling","371.04" "30.000","Ea","6 Inch Coupling","371.06" "30.000","Ea","8 Inch Coupling","371.08" "30.000","Ea","12 Inch Coupling","371.12" "300.000","Ft","Water Pipe Insulation Board","373." "2.000","Ft","4 Inch Water Pipe Insulation","373.04" "75.000","Ft","6 Inch Water Pipe Insulation","373.06" "30.000","Ft","8 Inch Water Pipe Insulation","373.08" "85.000","Ft","12 Inch Water Pipe Insulation","373.12" "2.000","Ea","Hydrant","376." "13.000","Ea","Hydrant - Removed And Reset","376.2" "20.000","Ea","Service Box","381." "20.000","Ea","Service Box Removed And Reset","381.1" "158.000","Ea","Service Box Adjusted","381.3" "8.000","Ea","Curb Stop","384." "5240.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "8200.000","Sy","Pavement Fine Milling","415.2" "98.000","Sy","High Early Strength Cement Concrete Base Course","431." "58000.000","Lb","Calcium Chloride For Roadway Dust Control","440." "95.000","Mgl","Water For Roadway Dust Control","443." "5440.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - p)","450.231" "5950.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "11900.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "400.000","Ton","Hma For Patching","451." "8300.000","Gal","Asphalt Emulsion For Tack Coat","452." "34500.000","Ft","Hma Joint Sealant","453." "22.000","Ton","Hot Mix Asphalt Berm","470." "2220.000","Ton","Hot Mix Asphalt For Miscellaneous Work","472." "880.000","Ft","Sawcutting Asphalt Pavement For Box Widening","482.5" "160.000","Ft","Granite Curb Type Va4 - Straight","504." "925.000","Ft","Granite Curb Type Va4 - Curved","504.1" "145.000","Ft","Granite Curb Type Va5 - Straight","505." "12000.000","Ft","Granite Curb Type Vb - Straight","506." "85.000","Ft","Granite Curb Type Vb - Curved","506.1" "3150.000","Ft","Granite Transition Curb For Wheelchair Ramps - Straight","509." "1140.000","Ft","Granite Transition Curb For Wheelchair Ramps - Curved","509.1" "147.000","Ea","Granite Curb Inlet - Straight","514." "4.000","Ea","Granite Curb Inlet - Curved","515." "4.000","Ea","Granite Curb Corner Type b","517." "370.000","Ft","Hot Mix Asphalt Curb Type 3","570.3" "2420.000","Ft","Curb Removed And Reset","580." "2900.000","Ft","Curb Removed And Discarded","594." "380.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "700.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "30.000","Ft","Guardrail - Curved, Tl-2 (Single Faced)","620.32" "7.000","Ea","Steel w Beam Terminal Section (Single Faced)","627.1" "7.000","Ea","Guardrail Tangent End Treatment, Tl-2","627.82" "1.000","Ea","Guardrail Flared End Treatment, Tl-3","627.93" "1.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "4.000","Ea","Transition To Bridge Rail","628.24" "48.000","Ft","Precast Concrete Median Barrier - Double Faced","629.2" "810.000","Ft","Highway Guard Removed And Discarded","630.2" "14.000","Ft","Metal Hand Rail","655.4" "1008.000","Ft","Temporary Fence","657." "92.000","Ft","Temporary Fence Removed And Reset","657.5" "575.000","Ft","Fence Removed And Stacked","669." "105.000","Cy","Stone Masonry Wall In Cement Mortar","685." "20.000","Cy","Stone Masonry Wall Removed And Rebuilt In Cement Mortar","690." "175.000","Ft","Balance Stone Wall Removed And Rebuilt","691." "200.000","Ea","Silt Sack","697.1" "70.000","Sy","Geotextile Fabric For Separation","698.3" "153.000","Sy","Geotextile Fabric For Permanent Erosion Control","698.4" "9050.000","Sy","Cement Concrete Sidewalk","701." "3925.000","Sy","Cement Concrete Sidewalk At Driveways","701.1" "1150.000","Sy","Cement Concrete Wheelchair Ramp","701.2" "1100.000","Ton","Hot Mix Asphalt Walk Surface","702." "7.000","Sy","Flagstone Walk","705." "11.000","Sy","Flagstone Walk Removed And Reset","705.1" "5.000","Sy","Brick Walk","706." "8.000","Sy","Brick Walk Removed And Relaid","706.1" "32.000","Ea","Boulder Removed And Stacked","706.7" "32.000","Ea","Bound - Plain Granite","710.4" "6.000","Ea","Bound Removed And Reset","711." "34.000","Ea","Rural Mail Box Removed And Reset","715." "59.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "1610.000","Cy","Loam Borrow","751." "1.000","Ls","Inland Wetland Replication Area","755.35" "40.000","Hr","Wetland Specialist","755.75" "1.000","Ls","Wetland Monitoring Reports","755.76" "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "11660.000","Sy","Seeding","765." "3510.000","Ft","Sediment Control Barrier","767.121" "17.000","Cy","Aged Pine Bark Mulch","767.6" "1800.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "781.000","Cf","Pavement Milling Mulch","769.1" "195.000","Ft","4 Inch Telephone Conduit - Type Nm (Double)","801.47" "725.000","Ft","4 Inch Telephone Conduit - Type Nm (4 Bank)","801.48" "44.000","Ft","4 Inch Telephone Conduit - Fiberglass (4 Bank)","801.49" "1680.000","Ft","3 Inch Electrical Conduit Type Nm - Plastic -(Ul)","804.3" "37.000","Ea","Pull Box 12 x 12 Inches - Sd2.031","811.31" "4.000","Ea","Pull Box Adjusted","811.35" "2.000","Ea","Electric Handhole Removed And Stacked","811.39" "1.000","Ls","Traffic Control Signal Location No. 1","815.1" "1.000","Ls","Traffic Control Signal Location No. 2","815.2" "1.000","Ls","Traffic Control Signal Location No. 3","815.3" "1.000","Ls","Traffic Signal Reconstruction Location No. 1","816.01" "1.000","Ls","Traffic Signal Reconstruction Location No. 2","816.02" "1.000","Ls","Traffic Control Signal Removed And Reset","816.40" "1.000","Ls","Traffic Control Signal Removed And Stacked","816.80" "110.000","Ft","Wire Loop Installed In Roadway","819.831" "1.000","Ls","Rectangular Rapid Flashing Beacon (Solar), Location No. 1","824.211" "17.000","Ea","Electric Service Riser Relocation","826.70" "976.000","Sf","Warning-Regulatory And Route Marker - Alum. Panel (Type a)","832." "15.000","Ea","Delineation For Guard Rail Termini","833.7" "148.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "400.000","Hr","Roadway Flagger","850.41" "100.000","Day","Traffic Cones For Traffic Management","851.1" "2750.000","Sf","Safety Signing For Traffic Management","852." "160.000","Ft","Temporary Pedestrian Barricade","852.11" "30.000","Ea","Temporary Pedestrian Curb Ramp","852.12" "18.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "710.000","Ft","Temporary Barrier Removed And Reset","853.21" "860.000","Ft","Temporary Barrier (Tl-3)","853.23" "80.000","Ft","Temporary Barrier - Limited Deflection (Tl-3)","853.33" "2.000","Ea","Temporary Impact Attenuator Removed And Reset","853.501" "5.000","Ea","Temporary Impact Attenuator Unidirectional, Redirective (Tl-3)","853.63" "540.000","Day","Temporary Illumination For Work Zone","853.8" "103600.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "10600.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "510.000","Sf","Pavement Marking Removal","854.1" "40.000","Ea","Raised Pavement Marker Removal","854.5" "2520.000","Day","Arrow Board","856." "405.000","Day","Portable Changeable Message Sign","856.12" "114000.000","Day","Reflectorized Drum","859." "585.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "52000.000","Ft","6 Inch Reflectorized White Line (Painted)","860.106" "20400.000","Ft","12 Inch Reflectorized White Line (Painted)","860.112" "51750.000","Ft","6 Inch Reflectorized Yellow Line (Painted)","861.106" "2200.000","Ft","12 Inch Reflectorized Yellow Line (Painted)","861.112" "96.000","Sf","Pavement Arrow And Legends - Tape","864.02" "1650.000","Sf","Pavement Arrows And Legends Refl. White (Thermoplastic)","864.04" "580.000","Ea","Slotted Pavement Marker Two-Way Yellow/Yellow","864.35" "400.000","Ft","Permanent Pavement Marking - 6 Inch (Tape)","864.906" "26400.000","Ft","6 Inch Reflectorized White Line (Thermoplastic)","866.106" "10250.000","Ft","12 Inch Reflectorized White Line (Thermoplastic)","866.112" "26400.000","Ft","6 Inch Reflectorized Yellow Line (Thermoplastic)","867.106" "1120.000","Ft","12 Inch Reflectorized Yellow Line (Thermoplastic)","867.112" "51.000","Ea","Street Name Sign","874." "9.000","Ea","Traffic Sign Removed And Reset","874.2" "3.000","Ea","Traffic Sign Removed And Stacked","874.4" "147.000","Ea","Traffic Sign Removed And Discarded","874.41" "3.000","Ea","Miscellaneous Signs Removed And Stacked","874.7" "10.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete","901." "40.000","Cy","3000 Psi, 1.5 In., 470 Cement Concrete","903." "2.000","Cy","4000 Psi, 3/4 Inch, 610 Cement Concrete","904." "2.000","Cy","5000 Psi, 3/4 Inch, 685 Hp Cement Concrete","904.3" "440.000","Lb","Steel Reinforcement For Structures - Epoxy Coated","910.1" "8.000","Ea","Drilling And Grouting Dowels","912." "700.000","Ft","Steel Pile Hp 10 x 57","942.102" "30.000","Ea","Steel Pile Splice Hp 10 x 57","944.102" "105.000","Ft","Pre-Drilling For Piles","944.2" "4.000","Ea","Dynamic Load Test By Contractor","948.41" "14.000","Ea","Pile Shoes","948.5" "1.000","Ls","Temporary Earth Support System","950.5" "82.000","Sy","Bituminous Damp-Proofing","970." "45.000","Ton","Dumped Riprap","983." "247.000","Ton","Riprap","983.1" "30.000","Ft","Clean And Re-Point Masonry Joints","989.221" "8.000","Ea","Repair Of Voids In Masonry","989.222" "2.000","Ft","Repair Of Drain Pipe","989.223" "6.000","Cy","Repairs To Concrete","989.3" "1.000","Ls","Control Of Water - Culvert Structure At Sta. 124+00","991.01" "1.000","Ls","Control Of Water - Structure No. w-03-024","991.02" "1.000","Ls","Control Of Water - Cobb's Pond Culvert","991.03" "1.000","Ls","Alteration To Bridge Structure No. w-03-013","992.1" "1.000","Ls","Temporary Pedestrian Bridge","993.2" "1.000","Ls","Temporary Protective Shielding Bridge No. w-03-024","994.01" "1.000","Ls","Bridge Structure, Bridge No. w-03-024","995.01" "1.000","Ls","Wall Structure, Wall No. 1","996.01"

Details

Division 01 - General Requirements, Temporary Construction, Temporary Bridges, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Storm Drainage Structures.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents