Similar Projects
Bimbo Group Production Facility
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
S Zanesville, OH 43701

Geologic Maintenance / Slide Repair
Infrastructure
Conception
$500,000 CJ est. value
S Zanesville, OH 43701

Construction of Structures and Facilities
Term Contract, Renovation, Infrastructure - 15,500 SF
Design
$10,000,000 CJ est. value
S Zanesville, OH 43701

2023 Road Resurfacing
Infrastructure
Bidding
$1,000,000 CJ est. value
S Zanesville, OH 43701

2023 Facility Pavement Improvements Zanesville Campus
Infrastructure
Bidding
$600,000 CJ est. value
S Zanesville, OH 43701

Dillon Lake State Park Wastewater Improvements
Infrastructure
Post-Bid
$2,600,000 CJ est. value
Nashport, OH 43830

2022 FDR Project
Infrastructure
Post-Bid
$1,000,000 CJ est. value
New Concord, OH 43762

API 653 External Tank Inspection
Results

Road Resurfacing
Infrastructure
Results
$5,859,361 CJ est. value
S Zanesville, OH 43701

Mitchell Water Storage Tank No.3 - Pioneer Tank Decommissioning Project
New Construction, Infrastructure
Construction
$3,035,439 CJ est. value
S Zanesville, OH 43701

Mitchell Water Storage Tank No.3 - Pioneer Tank Decommissioning Project
New Construction, Infrastructure
Construction
$3,035,439 CJ est. value
S Zanesville, OH 43701

RFQ Construction Manager at Risk - Muskingum River Parkway Lock and Dam Rehabilitation and Phase 2 IRRMs
Infrastructure
Post-Bid
$13,400,000 CJ est. value
S Zanesville, OH 43701

Water Main Extensions
Infrastructure
Results
$1,527,316 CJ est. value
S Zanesville, OH 43701

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

O.R.C. 307.87 - Road Resurfacing
Infrastructure
Results
$2,108,138 CJ est. value
S Zanesville, OH 43701

Last Updated 04/28/2023 02:21 PM
Project Title

Contract No. 3 - Dozer Ridge Road Water Storage Tank

Physical Address View project details and contacts
City, State (County) Brush Creek Township, OH 43720   (Muskingum County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $568,857 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Method of Bidding will be as follows: CONTRACT NO. 3: LUMP SUM CONTRACT consisting of all work necessary to construct a 14- foot diameter by 102-foot tall; 116,000 gallon bolted, glass-fused to steel ground storage standpipe, complete with foundation; site grading; access road; telemetering equipment vault; site piping; disposal of excess excavated materials; site fencing; and other incidental work to provide a complete, operational water storage tank and other appurtenances necessary to complete the DOZER RIDGE ROAD WATER STORAGE TANK. The Owner reserves the right to waive any informality or to reject any and all Bids. Each Bidder must submit with his Bid, security in the amount, form and subject to the conditions provided in the Instruction for Bidders. All work done under this contract shall be subject to all Federal Davis Bacon Wage rates and rules. Each Proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each Bidder must submit evidence of its experiences on projects of similar size and complexity. All Contractors and subcontractors involved with the project will, to the extent practicable use Ohio Products, materials, services, and labor in the implementation of their project. Additionally, Contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and Governor's Executive Order 84-9 shall be required. The Contractor shall not discriminate on the basis of race, color, national origin or sex in the performance of this contract. The Contractor shall carry out applicable requirements of 40 CFR Part 33 in the award and administration of contracts awarded under EPA financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach of this contract which may result in the termination of this contract or other legally available remedies. This procurement is subject to the EPA policy of encouraging the participation of small business in rural areas (SBRAs). Domestic iron and steel use requirements as specified in P.L. 113-76, "Consolidated Appropriations Act, 2014" apply to this project. See additional information titled United States Environmental Protection Agency Memorandum found under Document 00820 (Additional Articles) in the Contract Documents. No Bidder may withdraw his Bid within 60 days after the actual date of the opening thereof.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents