Similar Projects
St. Thomas Island Drive - Beresford Creek Crossing - City of Charleston
Infrastructure
Conception
$751,467 CJ est. value
Charleston, SC 29492

Section/corridor Improvements - S-29 - Eagle Rd (S-251) to S-585 (Near Garwood Rd)
Infrastructure
Conception
$2,500,000 CJ est. value
Moncks Corner, SC 29461

Baker Motors - Alfa Romeo, Maserati and Rolls Royce Dealership
Demolition, New Construction, Infrastructure - 11,240 SF
Design
$5,000,000 CJ est. value
Charleston, SC 29407

O'Quinn School Addition
Addition, Demolition, Infrastructure - 21,000 SF
Design
$4,500,000 CJ est. value
Charleston, SC 29412

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Contractors - New Ladson Elementary School
New Construction, Infrastructure - 118,000 SF
Bidding
$65,000,000 CJ est. value
Ladson, SC 29456

Seawater Intake Repair
Term Contract
Post-Bid
Charleston, SC 29412

Proposed Mitigation Plans for SC-91 (Berlin Myers Parkway) Phase 3
Infrastructure
Post-Bid
$200,000 CJ est. value
Summerville, SC 29483

Berkeley Dorchester Interconnect Division 1
Infrastructure
Results
Ridgeville, SC 29472

Stoney Field Improvements Phase 3
Infrastructure
Results
Charleston, SC 29403

Southern Eagle Expansion
Addition, Demolition, Infrastructure
Construction
$3,000,000 CJ est. value
Charleston, SC 29492

Southern Eagle Expansion
Addition, Demolition, Infrastructure
Construction
$3,000,000 CJ est. value
Charleston, SC 29492

St. Andrews Mixed Use Development
New Construction, Infrastructure - 11,400 SF
Pending Verification
$25,000,000 CJ est. value
Charleston, SC 29407

Woodfield II at Pointhope
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Charleston, SC 29492

Sportsman Island Boat & RV Storage Facility
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Charleston, SC 29492

Last Updated 12/19/2022 11:08 AM
Project Title

Pineview Galvanized Water Main Replacements

Physical Address View project details and contacts
City, State (County) Goose Creek, SC 29445   (Berkeley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $822,670 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Pineview Galvanized Water Main Replacement project will consist of the installation of +/- 5040 LF of new six-inch C900 PVC and Class 50 Ductile Iron Pipe to replace small, galvanized water mains that have reached their useful life. Included in the project is the installation of several new gate valves to increase our ability to isolate the main and installation of six new fire hydrant assemblies to increase fire protection. All tasks will be accomplished by a SC licensed utility contractor and inspected by city personnel. The Owner reserves the right to waive any informalities in bidding and to reject all Bids if it is in the Owner's best interest to do so. Unless all bids are rejected, award will be to the low responsive, responsible Bidder Bid Bond: 5% Performance Bond: 100% Payment Bond: 100% Completion Date: 180 Calendar Days

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents