Similar Projects
Mourning Dove WTP - Solids Train Upgrade
Bidding
Less than $6,200,000 est. value
Titusville, FL 32796

Westside Regional WRF Biosolids Dewatering System Improvements
Bidding
Less than $3,600,000 est. value
Daytona Beach, Port Orange, FL 32124

City of Dunedin Water Treatment Plant Refurbishment
Term Contract
Post-Bid
$26,500,000 est. value
Dunedin, FL

Wastewater Treatment Facility Operations Building and Hardening Of Biosolids Facility
New Construction
Post-Bid
$66,750 est. value
Clearwater, FL

Water and Wastewater Treatment Facility Rehabilitation and Repairs - WORCS 9
Term Contract
Results
Less than $1,320,000 est. value
FL

Design Build - Dunn Water Reclamation Facility Filtration and Disinfection Improvements Project
Results
$7,750,000 est. value
Palm Harbor, FL 34683

Deltona North Water Treatment Plant Improvements
Construction
Less than $1,800,000 est. value
De Land, FL 32720

RWRF Phase I Plant Improvements
Construction
Less than $6,700,000 est. value
Altamonte Springs, FL

CR 136 / I-75 Water Treatment Plant
Bidding
FL

Wastewater Reclamation Facility - Headworks Mechanical Screen Project
Post-Bid
Gainesville, FL

Carlton WTP Rehabilitation Phase 1
Results
Venice, FL 34292

Greenland Water Treatment Plant (WTP) - Expansion from 6.0 to 9.0 MGD
Addition
Construction
Jacksonville, FL 32256

Westside Regional WRF Battery Replacement UV-UPS System
Bidding
Daytona Beach, FL 32100

Advanced Wastewater Treatment Plant P-663 at Naval Station Mayport, Jacksonville Florida
Post-Bid
$25,000,000 to $100,000,000 est. value
Amelia City, Jacksonville, FL 32034

Installation and Maintenance of Potable Water Filtration Systems
Results

Last Updated 01/11/2019 02:28 PM
Project Title

Westside Regional Water Reclamation Facility Improvements

Physical Address View project details and contacts
City, State (County) Daytona Beach, FL 32124   (Volusia County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method
Project Status Construction Commenced, Construction Completion Expected July 2020
Bids Due View project details and contacts
Estimated Value $30,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The construction includes improvements to RAS/WAS pumping, aeration and new tertiary deep bed filters. PC Construction is seeking partners to join our team and participate in this exciting Florida project.
Details
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents