Similar Projects
Sportsplex Wastewater Line Upsize Project
Bidding
Buda, TX 78610

Parten Ranch, Phase 5 Paving, Drainage, Water and Wastewater Improvements
Bidding
Dripping Springs, TX 78620

Sunfield Phase 3 Section 6A Street Improvements and Sunfield Phase 3 Section 6A Drainage, Water, Wastewater, and Utility
Post-Bid
Buda, TX

Sunfield Phase 4 Mass Grading Improvements
Post-Bid
Buda, TX 78610

Kingsbury Road 8-inch Pipeline Extension
Results
Less than $651,574 est. value
San Marcos, TX

Surface Water Treatment Plant Low Water Crossing
Results
$225,000 est. value
San Marcos, TX

Sunfield Phase 3 Section 6A Street, Drainage, Water, Wastewater, and Utility Improvements, The Sunfield Phase 3 Section 6B Street, Drainage, Water, Wastewater, and Utility Improvements; Sunfield Phase
Post-Bid
Buda, TX

Replace Influent Chiller-2019
Results
$95,000 to $108,000 est. value
San Marcos, TX 78666

Construction Package #3 - Waterline Improvements & ARV Installation
Post-Bid
Less than $3,360,000 est. value
San Marcos, TX 78666

Cottonwood Creek 24" Water Main Extension
Results
Less than $2,428,000 est. value
San Marcos, TX

Sunfield Phase 3 Section 5C Street Improvements and Sunfield Phase 3 Section 5C Drainage, Water, Wastewater, and Utility Improvements
Post-Bid
TX

Meadows at Buda Phase II Force Main Improvements
Results
Buda, TX

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Post-Bid

Alliance Water - Phase 1A Pipeline Segment B
Results
Kyle, TX 78640

Uhland 2019 Water Improvements
Results
Less than $165,000 est. value
Uhland, TX

Last Updated 11/27/2018 09:05 AM
Project Title

Meter Installation and Field Service Upgrade

Physical Address View project details and contacts
City, State (County) San Marcos, TX   (Hays County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Removing the existing electric meters and water nodes and installing new. A large portion of water meters will need to be reset as well. The City wishes to install the new system over 18-24 months to make certain the system works well before getting too far ahead. The project is expected to begin during the first quarter of 2019.
Details
Division 26 - Electrical.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents