Similar Projects
O'Reilly Auto Parts Store (D29) / Dallas
New Construction, Infrastructure - 7,453 SF
Conception
$1,500,000 CJ est. value
Dallas, TX 75227

Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

Maple Avenue Apartments
New Construction, Infrastructure
Design
$3,600,000 CJ est. value
Dallas, TX 75235

Carbon Pump Station Improvements
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Irving, TX 75038

Carbon Pump Station Improvements
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Irving, TX 75038

Lake Highlands Trail Phase II - A and B and Lake Highlands Northern Extension - Site Development
Infrastructure
Results
$4,392,297 est. value
Dallas, TX

Nantucket Branch Channel Improvements
Infrastructure
Results
$947,313 est. value
Richardson, TX 75081

Irving Mall Site Work
Renovation - 767,000 SF
Construction
Irving, TX 75062

Elm Fork Water Treatment Plant Filter Complex - Phase I
New Construction, Infrastructure
Construction
$155,100,000 CJ est. value
Carrollton, TX 75006

Haven at Waterview / Richardson
New Construction, Infrastructure - 300,212 SF
Pending Verification
$90,000,000 CJ est. value
Richardson, TX 75081

McKinney Avenue Mixed-Use
New Construction, Infrastructure - 697,000 SF
Pending Verification
$200,000,000 CJ est. value
Dallas, TX 75201

City Jail Expansion and Upgrades - City of Carrollton
Addition, Demolition, Renovation, Infrastructure
Design
$2,400,000 CJ est. value
Carrollton, TX 75006

Replacement of Fire Station 41
New Construction, Infrastructure - 8,248 SF
Post-Bid
$4,208,000 CJ est. value
Dallas, TX 75230

Construction of Water, Sanitary Sewer, Storm Sewer, Drainage, and Paving Facilities for Friendship Oaks Phase 1A-1B
Infrastructure
Results
Irving, TX

Taco Bell / Dallas
New Construction, Infrastructure - 2,050 SF
Construction
$450,000 CJ est. value
Dallas, TX 75223

Last Updated 06/06/2023 05:18 AM
Project Title

Architect-Engineer (AE) Services for Design-Build (DB) RFP Development for Dallas Floodway System- Dallas Floodway and Dallas Floodway Extension Flood Risk Management (FRM) Element

Physical Address View project details and contacts
City, State (County) Dallas, TX 75208   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids, Design-Build Firm to Subcontract
Project Status Request for Qualifications, Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from Agency's Affiliate - 02/01/19
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.spartnerships.com/newsletter/current/tgi.html Dallas eyes completion of Trinity levees As the U.S. Army Corps of Engineers (USACE) broke ground this week to raise several levees and build pump stations included in the Dallas Floodway Extension Project, officials looked ahead to future measures to alleviate flooding along the Trinity River. Cadillac Heights and Lamar levees will be built with the funding provided from the Bipartisan Act of 2018 that allocated more than $450 million for the entire project. The inclusion of $135.25 million for the Lamar and Cadillac Heights levees will complete the project. A new Cadillac Heights Levee is planned to protect the neighborhood on the west side of the Trinity River for 2.25 miles. It will connect with the Central Wastewater Treatment Plant Levee. A new Lamar Levee will be constructed along Lamar Street on the east side of the river for 3 miles. It will connect to the existing Rochester Park Levee. The Dallas Floodway Extension will reduce flood elevations within the existing Dallas Floodway such that the existing floodway levees can pass at least a 500-year flood event without overtopping. The existing levees provide 300-year protection to the downtown Dallas vicinity. ________________________________-- This announcement is an unrestricted procurement of one (1) AE Services C-Type Contract. This Civil Works AE Services contract is being procured in accordance with Public Law (PL) 92-582, formally known as the Brooks Act, as implemented in the Federal Acquisition Regulation (FAR) Subpart 36.6. Firms must demonstrate competence and qualifications for the work stated in this synopsis, for selection for negotiation. This announcement is open to all firms regardless of size. One (1) firm-fixed-price contract will be negotiated. If a large business is selected for this contract, it must comply with FAR 52.219-9 regarding the requirement for a subcontracting plan on the work it intends to subcontract. The subcontracting plan is not required with this submittal, but will be required with the fee proposal of the firm selected for negotiations. The North American Industrial Classification System (NAICS) code for this procurement is 541330 (Engineering Services), which has a small business size standard of $15,000,000. The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents