Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Bridge Repair
Infrastructure
Design
$535,689 CJ est. value
Cadiz, OH 43907

Minor Reconstruction - SR 646
Infrastructure
Bidding
$614,252 CJ est. value
Scio, OH 43988

Minor Reconstruction - SR 646
Infrastructure
Bidding
$614,252 CJ est. value
Scio, OH 43988

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Parking Lot and Entrance Re-Sealing Project
Results
Less than $33,389 est. value
Cadiz, OH

FEMA Funded Road Repair for Bales Lane TR 9634
Results
$177,488 est. value
Freeport, OH

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

Blacktop Project , Replacing 2 Culverts and Sub-grading
Infrastructure
Bidding
$200,000 CJ est. value
Deersville, OH 44693

Asphalt Paving
Infrastructure
Post-Bid
Bowerston, OH

Two Lane Resurfacing-HAS-SR 9-22.44
Infrastructure
Results
OH

Geologic Maintenance / Slide Repair - SR 258
Infrastructure
Design
$480,000 CJ est. value
Tippecanoe, OH 44699

Paving at Longview Cemetery
Infrastructure
Post-Bid
$2,000,000 est. value
Bowerston, OH

Spot Patching / Pavement Repair-HAS-US 22-15.25
Infrastructure
Results
OH

Last Updated 09/14/2022 08:38 AM
Project Title

Roadway Minor Rehab - SR 519

Physical Address View project details and contacts
City, State (County) Cadiz, OH 43907   (Harrison County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $509,178 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of drainage structures, pavement repairs, curb replacement, and full depth shoulder paving. EDGE Goal: 5.0% OHDOT - Roadway Minor Rehab - SR 519

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents