Similar Projects
Brentwood Boulevard Sewer and Water Main - 562-56392 - City of Brentwood
Infrastructure
Conception
$2,812,000 est. value
Brentwood, CA

Pump Station 2.4 Installation - City of Brentwood
Infrastructure
Conception
Brentwood, CA 94513

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Remove PCC and AC, Place PCP and AC Resurfacing
Infrastructure
Bidding
$60,000,000 CJ est. value
Blackhawk, CA 94506

Remove PCC and AC, Place PCP and AC Resurfacing
Infrastructure
Bidding
$60,000,000 CJ est. value
Blackhawk, CA 94506

Remove and Install Guardrails and Construct Concrete Barriers
Infrastructure
Sub-Bidding
$12,200,000 CJ est. value
Brentwood, CA 94513

Remove and Install Guardrails and Construct Concrete Barriers
Infrastructure
Sub-Bidding
$12,200,000 CJ est. value
Brentwood, CA 94513

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Concord DMV Field Office
Term Contract
Post-Bid
Concord, CA 94520

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Paving Repairs and Ramps at FHFB
Term Contract
Results
Richmond, CA

Water Leak Repair-Richmond
Alteration
Results
$400,000 est. value
Richmond, CA 94804

Traditions at the Meadow Subdivision
New Construction - 7,500 SF
Pending Verification
$1,000,000 est. value
Martinez, CA 94553

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Waterline Improvement - Kent Drive - City Of Brentwood
Alteration
Conception
$336,000 est. value
Brentwood, CA 94513

Last Updated 01/17/2023 08:29 AM
Project Title

Hillcrest Park Regional Green Infrastructure Project

Physical Address View project details and contacts
City, State (County) Concord, CA 94520   (Contra Costa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $3,842,742 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done in general consists of mobilization, traffic control, dewatering, temporary water diversion, clearing and grubbing, tree removal and trimming, demolition and removal, storm water pump stations, wet well structures, diversion structures, junction chambers, storm water trash capture units, underground storm water detention system, bioretention basins, storm drain pipes, storm drain manholes, drainage inlets, curbs, curb and gutter, curb ramps, valley gutters, sidewalks, paving, signing, striping and markings, storm water pumps, controls and valves, planting, irrigation system , electrical system and lighting, and all other work as specified in these Special Provisions and shown in the Drawings. For information regarding the project, contact Kevin Wheat, P.E., Project Manager, at kevin.wheat@cityofconcord.org. The deadline for submitting questions about this project is 12:00 PM on April 26, 2022. All Bids Shall Be Presented Under Sealed Cover and Shall Be Accompanied by Cash, Cashier's or Certified Check or a Bidder's Bond Executed by a Corporate Surety Insurer. The Bidder's Guarantee Shall Be in an Amount Equal to at Least Ten Percent (10%) of the Amount Bid and Made Payable to the City of Concord.

Details

Park/Playground, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents