Similar Projects
Last Updated | 12/20/2022 10:07 AM |
Project Title | RFP Construction Manager at Risk - Construction Manager at Risk Water Treatment Plant Upgrades and Expansion |
Physical Address | View project details and contacts |
City, State (County) | Loudon, TN 37774 (Loudon County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Sewage Treatment Plant, Site Development, Water Lines |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | Design Development, Construction start expected July 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $1,100,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The owner has selected a Construction Manager. A timeline for construction has not yet been established. The Project consists of the following major elements: pre-construction consultation and construction of new additions and modifications to the existing water treatment plant facilities including: raw water pump station upgrades, rehabilitation of existing flocculation basins, sedimentation basins, and filters, construction of new flocculation basins, sedimentation basins, and filters, high service pump upgrades, two new chemical storage and feed facilities, a new administrative area, and all associated site, architectural, mechanical, electrical, and instrumentation and control work. Loudon Utilities will in no way be liable for any costs incurred by any Proposer in the preparation of its Proposal in response to this Request for Proposal. Loudon Utilities reserves the right to reject all Proposals and to waive irregularities and informalities. Any Proposer that contacts any of Loudon Utilities' elected officials or staff, or Loudon Utilities' consultant, Barge Design Solutions, Inc., (except as allowed under Article 2.03 of the Request for Proposal) directly or indirectly after the date of issue of this invitation for the purpose of influencing the selection process prior to award shall be immediately disqualified and removed from consideration. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |