Similar Projects
Well Number 12 Project
Infrastructure
Bidding
Peyton, CO

Well D - 2 Drilling
Infrastructure
Bidding
Monument, CO

Construction and Testing of Arapahoe Well D-1Rr Project
Post-Bid
Parker, CO 80134

Drilling, Construction and Testing of LIRF Monitoring Wells
Post-Bid
Castle Rock, CO 80104

Repair by Replacing Domestic Water Pumps B420
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

Six Denver Basin Aquifer Wells Drilling Project
Results
Denver, CO

Non-Potable Pond Pump Station
Construction
Brighton, CO 80601

CU Denver Building Add Domestic Water Pump
Post-Bid
$250,000 to $300,000 est. value
Aurora, CO 80045

EC, Provide Sump Pump and Controls
Results
Loveland, CO 80537

A-6 and LFH-6 Well Equipping
Post-Bid
Peyton, CO 80831

2020 Well Maintenance Project
Results
Less than $279,000 est. value
Aurora, CO 80016

A-6 and LFH-6 Well Site Improvements
Post-Bid
Peyton, CO 80831

Bellvue Backwash Supply and Backwash Waste Pump Replacement Designs
Results
Greeley, CO 80512

Replace Cimarron Water Well System
Post-Bid
$500,000 to $1,000,000 est. value
Gunnison, CO

Repair MATES Recycle Water System
Results
$425,000 est. value
Fort Carson, CO 80913

Last Updated 08/03/2021 01:38 PM
Project Title

Directional Boring and Trenching

Physical Address View project details and contacts
City, State (County) Fort Collins, CO   (Larimer County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified Service Providers to perform directional boring and/or trenching operations, potholing to locate underground utilities or verify clear zones for traffic signal caisson installation, vacuum excavation of traffic signal caissons and to dewater caissons. The City of Fort Collins Light and Power Operations Department (L&P) will be the primary users of this contract, while the Traffic Operations Department will also request work of the chosen Service Providers. Additional City departments may utilize this contract occasionally. The selected Service Provider(s) will work closely with L&P crews, L&P customers, and other City Project Managers. The City intends to select Service Provider(s) to assist L&P, Traffic and other City departments in installing conduits and enclosures for underground electric lines and fiber optic lines, mostly in existing subdivisions. Potholing and vacuum excavation are also needed services required of the Service Providers.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents