Similar Projects
SGR - Road Improvements - US-33
Infrastructure
Bidding
$8,535,000 CJ est. value
Harrisonburg, VA 22801

Lynchburg Riverfront Park Development and Renovation Project
Renovation
Bidding
$491,000 CJ est. value
Lynchburg, VA 24504

Retaining Wall Material - Skate Park
Infrastructure
Post-Bid
Charlottesville, VA 22903

Fire Station 10 Concrete Repairs
Alteration
Post-Bid
Portsmouth, VA 23702

2022 Concrete Pavement Repair
Alteration
Results
$1,083,000 est. value
Virginia Beach, VA

Prestressed Concrete Cluster Springs AHQ
Alteration
Results
South Boston, VA 24592

2022 Paving and Milling
Infrastructure
Construction
$434,881 CJ est. value
Wytheville, VA 24382

Leesburg Executive Airport - Apron Paving
Infrastructure
Bidding
$300,000 CJ est. value
Leesburg, VA 20175

Concrete Piles
Infrastructure, Alteration
Post-Bid
VA

On-Call Concrete, Asphalt and Brick-Pavers
Term Contract, Infrastructure
Results
$700,000 est. value
Hampton, VA

Concrete Pump
Alteration
Post-Bid
Staunton, VA 24401

Masonry Wall and Underpinning Repairs at Rappahannock Community College
Alteration
Results
Saluda, VA 23149

Two Concrete Pads - Solid Waste Convenience Center and Transfer Station
Alteration
Post-Bid
Hanover, VA 23069

Concrete Work
Alteration
Results
Less than $750,000 est. value
VA

Joint Public Service Authority (JPSA) Concrete Work
Alteration
Post-Bid
$468,000 est. value
Wytheville, VA 24382

Last Updated 06/16/2023 11:17 AM
Project Title

Chuck E. Cheese #056 / Richmond

Physical Address View project details and contacts
City, State (County) Richmond, VA 23230   (Henrico County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Updating interior finishes and adding a video wall and LED dance floor. This will include remodeling the Restroom. Trades include: Concrete Saw Cutting, Trim Carpentry, Rough Carpentry, Storefront Doors, EIFS resurfacing, Drywall/Metal Stud Framing, Acoustical Ceilings, Ceramic Tile, Carpet Labor, Interior Painting, Texture Patching, Drywall Finishing, Plumbing, & Electrical.

Details

1 Story Above Grade, 13,820 SF.
Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents