Similar Projects
Juniper Springs Road 16-Inch Water Line Extension
Alteration
Bidding
$2,000,000 est. value
Gilbert, SC 29054

Hanger Fans
Term Contract
Bidding

JMWSC: Plant Transmission Main
Post-Bid
Less than $7,750,000 est. value
SC

Furnish and Deliver Annual Maintenance and Support for an APC/Schneider Cooling System, Pumps and In-Row Coolers
Post-Bid
Lexington, SC

SCETV Energy Efficiency
Results

MTC Industrial Building Transformer Replacement
Results
$100,000 to $250,000 est. value
West Columbia, SC 29170

Purchase and Installation of a 110 Ton Trane or Carrier Chiller
Post-Bid
Lexington, SC

HVAC Unit
Results
Less than $11,051 est. value
Irmo, SC 29063

Switch Upgrades
Term Contract
Post-Bid
West Columbia, SC

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Fluorescent Lamps
Post-Bid
Irmo, SC 29063

Trane HVAC Units
Results
West Columbia, SC 29169

HVAC Replacement
Post-Bid
$400,000 to $500,000 est. value
West Columbia, SC 29170

Riverside WTP Generator Addition
Results
Less than $489,000 est. value
West Columbia, SC 29169

ADA Compliant Ramp
Post-Bid
$20,000 est. value
West Columbia, SC

Reported 06/25/2021 12:00 AM
Project Title

Guaranteed Energy and Water Conservation Services

Physical Address View project details and contacts
City, State (County) Irmo, SC   (Lexington County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Finishes/Exterior, HVAC, Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The ESCO selected through the RFQ and RFP processes shall provide the District with a comprehensive energy and water services program including but not limited to the following: 1. A complete energy and water audit of the District’s selected facilities as determined by negotiation with the selected ESCO. The audit shall include but not be limited to lighting and lighting controls, water conservation, HVAC equipment and controls, energy management systems and controls, and building envelope improvements. 2. The design, acquisition, and installation of energy efficient equipment and systems. 3. The monitoring of energy/utility usage and costs on an annual basis.

Details

Division 09 - Finishes.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents