Similar Projects
New West Side Elementary School
New Construction
Conception
Waverly, IA 50677

New Northeast School
New Construction
Conception
Waverly, IA

11th Elementary School
New Construction
Design
Urbandale, IA

2021 Bond Passed - East Mills School District
Addition, Demolition, New Construction, Infrastructure, Renovation
Design
$22,000,000 CJ est. value
Malvern, IA 51551

Sioux Central CSD Greenhouse Project
New Construction, Infrastructure - 876 SF
Bidding
$450,000 CJ est. value
Sioux Rapids, IA 50585

Twain Elementary School Restroom Remodel
Renovation
Bidding
$1,000,000 CJ est. value
Iowa City, IA 52240

Audubon CSD MS and HS Facility Improvements - Interior
Renovation
Post-Bid
Audubon, IA 50025

North Linn Middle & High School Upgrade
Renovation
Post-Bid
$11,500,000 est. value
Coggon, IA 52218

Camanche High School Phase III
Renovation, Addition
Results
$9,000,000 est. value
Camanche, IA 52730

Futures High School and Homeschool Building
New Construction
Results
Boone, IA 50036

Emergent #19038 Building Renovation
Renovation - 31,200 SF
Construction
Waterloo, IA 50702

Fort Madison 7-12 and PK-6 - Additions and Renovations - Rebid
Addition, Demolition, Renovation, Infrastructure
Construction
$25,723,839 CJ est. value
Fort Madison, IA 52627

Elementary School 12 - 2020 Bond - Waukee Community School District
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Waukee, IA 50263

September 2021 Bond - District Wide Improvements - Logan-Magnolia School District
Renovation
Pending Verification
$10,000,000 CJ est. value
Logan, IA 51546

2020 Bond - New Elementary School - Southeast Polk Community School District
New Construction, Infrastructure
Conception
$25,000,000 CJ est. value
Altoona, IA 50009

Last Updated 05/31/2023 09:52 AM
Project Title

2021 Measure - Boyer Valley Community Schools

Physical Address View project details and contacts
City, State (County) Dunlap, IA 51529   (Harrison County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $8,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Projects consists of an addition to the high school building including a gymnasium/band room, repairs and renovations to the high school building and elementary building. As of February 16, 2022, this project is in the design phase. No firm timeline has been established for the construction. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. As of May 31, 2023, no new information available

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents