Similar Projects
Refurbish HVAC System B Building CMHIFL
Alteration
Bidding
$981,000 est. value
Denver, CO

AHEC-20404-B: Arts Building Ventilation Enhancement
Post-Bid
Denver, CO 80204

SB267 Replace Chiller and Chilled Water Loop - Downtown Capitol Complex
Post-Bid
$2,100,000 est. value
Denver, CO

HVAC Preventative Maintenance and Repair Services
Results
Byers, Centennial, Deer Trail, Denver, Englewood, Sheridan, CO 80112

HVAC System - 2011-124M14, 2011-124M19 Sb267, 2015-117M19
Results
Denver, CO

Ground Power Units (Jetway Mounted) and PC Air Handlers for Concourse A
Post-Bid
Denver, CO 80202

A/C Replacement at 1525 Sherman Street Lobby
Results
Denver, CO

HVAC
Term Contract
Post-Bid
Denver, CO 80223

Repair/Replace Air Handler Unit
Results
Less than $200,000 est. value
Denver, CO

J041--OCC-Data Center A/C Repairs Pop: 09-25-2020 To 09-24-2021
Post-Bid
Denver, CO 80209

Concourse A and C Pre-Conditioned Air Re-Life
Results
Denver, CO

Noel Air Cooled Chiller Design Build
Post-Bid
Denver, CO 80239

Air Conditioning Units
Results
Denver, CO 80203

J041--OCC-Data Center A/C Repairs Pop: 11-20-2020 To 11-19-2021
Post-Bid
Denver, CO

Annual HVAC Maintenance
Term Contract
Results
Less than $135,000 est. value
Denver, CO 80230

Last Updated 06/10/2021 03:20 PM
Project Title

Exhaust Fan Replacement

Physical Address View project details and contacts
City, State (County) Denver, CO 80230   (Denver County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $120,000 to $140,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project work includes but not limited to: 1.Remove and replace ten (10) exhaust fans. 2. Remove and replace flexible inlet connection. 3. Install new waterproof receptacles. 3. Disconnect/reconnect BAS. 4. Coordinate efforts and assist with third party commissioning agent. 5. TAB services. 6. Contractor is responsible for the disposal of all equipment, material and waste. 7. Permit/Inspection from the State of Colorado Electrical Board; pass inspection(s) noted on the Compliance Notice; completion of Building Inspection Record.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents