Similar Projects
Robert Street Pedestrian-Bike Pathway - City of Cody
Infrastructure
Conception
$450,000 CJ est. value
Cody, WY 82414

Robert Street Pedestrian-Bike Pathway - City of Cody
Infrastructure
Conception
$450,000 CJ est. value
Cody, WY 82414

Powell Valley Healthcare - Powell Ambulance Garage
New Construction, Infrastructure - 2,560 SF
Bidding
$250,000 CJ est. value
Powell, WY 82435

Powell Valley Healthcare - Powell Ambulance Garage
New Construction, Infrastructure - 2,560 SF
Bidding
$250,000 CJ est. value
Powell, WY 82435

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

North Wilson Area Snow Removal Project (7-21-M)
Term Contract, Infrastructure
Results

District 5 Crack Seal
Infrastructure
Results

Rocky Mountain Granite
New Construction, Infrastructure - 5,000 SF
Pending Verification
$600,000 CJ est. value
Cody, WY 82414

Rocky Mountain Granite
New Construction, Infrastructure - 5,000 SF
Pending Verification
$600,000 CJ est. value
Cody, WY 82414

Cody to Montana Wyoming 120 - 1502016 - Park County
Infrastructure
Conception
$2,863,000 CJ est. value
Cody, WY 82414

PCSD1 Southside Elementary Addition and Kitchen Renovation
Addition, Demolition, Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Powell, WY 82435

WY NPS YELL 12(2) Yellowstone River Bridge
Demolition, New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Yellowstone National Park, WY 82190

Rading, Bituminous Pavement Surfacing, Slide Stabilization Rock, Aggregate Columns, Temporary Concrete Barriers and Miscellaneous Work
Infrastructure
Results
WY

Sweets Soda Shoppe
New Construction, Infrastructure - 502 SF
Pending Verification
$200,000 CJ est. value
Cody, WY 82414

Last Updated 09/30/2022 11:36 AM
Project Title

Infrastructure Improvements - East Sheridan Intersects with Beacon Hill Road

Physical Address View project details and contacts
City, State (County) Cody, WY 82414   (Park County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $1,250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improve intersection Sheridan Ave and Beacon Hill Road from 38th St (adjacent to proposed PCSD#6 Bus Barn) to Beacon Hill Road and to north. As of September 30, 2022, this project is included in the City of Cody's FY 2022-2031 Budget CIP and funding for construction is allocated for 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents