Similar Projects
Roadway Improvements Along Atco Avenue (CR 710), Jackson Road (CR 534) to Railroad, MP 3.36 to MP 2.25, Waterford Township
Infrastructure
Bidding
Atco, NJ 08004

Improvements to the Intersection of Hartland Commons, Sabella Drive and Cozzens Lane (C.R. 608)
Infrastructure
Bidding
North Brunswick Township, NJ 08902

Milling of Various City Streets
Post-Bid
New Brunswick, NJ 08901

2020 NJDOT Rahway Road Resurfacing
Post-Bid
Rahway, NJ 07065

Morrow Road Improvements
Results
Englewood, NJ

Oakland Street and Coolidge Avenue Improvements
Results
Englewood, NJ

Atlantic Avenue Road Diet, Phase 1
Infrastructure
Bidding
Atlantic City, NJ 08405

Memorial School Safety Improvement
Post-Bid
Paramus, NJ 07652

Fourth Street Road Reconstruction
Results
Cape May Court House, NJ

Schoolhouse Road Improvements Project Phase III
Infrastructure
Bidding
North Hanover, NJ 08562

2020 Capital Program 4 NJAW Roadway Improvements
Post-Bid
$78,700 est. value
Howell, NJ 07731

Reconstruction of Darmstadt Avenue
Results
NJ 08215

Hockamick Road Phase I
Infrastructure
Bidding
Cookstown, NJ 08511

Streetscape and Two-Way Conversion of Main Street (Atlantic Street to Mercer Street)
Post-Bid
Hackensack, NJ 07601

FY 2018 NJDOT Municipal AID Program Improvements to Mola Boulevard from Hillman Drive to Route 46
Results
Less than $265,210 est. value
Elmwood Park, NJ 07407

Last Updated 10/22/2021 09:50 AM
Project Title

Culvert Repairs Milepost 112 To 113

Physical Address View project details and contacts
City, State (County) State-Wide: NJ
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals are invited for Contract No. P200.545, which involves rehabilitation using slip-lining of the existing 120-inch diameter Corrugated Metal Pipe (CMP) culverts located at Milepost 112.42N and Milepost 112.51S, and which convey Nut Swamp Brook under the Garden State Parkway (GSP) Northbound and Southbound Local and Express roadways, respectively. Additionally, the work includes replacement using trenchless pipe installation of the existing 66-inch diameter CMP culvert located at Milepost 112.17, which convey a tributary of Nut Swamp Brook under the Garden State Parkway (GSP) Northbound Local and Express roadways, and GSP Southbound Local and Express roadways, respectively. The work also involves storm pipe cleaning, drainage repairs and replacement, concrete headwall repairs, new headwall construction, maintenance and protection of traffic measures on the Garden State Parkway from Milepost 112 to Milepost 113 in Middletown Township, Monmouth County, New Jersey.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents