Similar Projects
Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Residential Weatherization Work
Post-Bid
Greenfield, Northampton, MA 01063

Greenhouse Mechanical Ventilation Upgrades
Results
$80,000 est. value
Greenfield, MA 01301

Roof Top Unit Turners Falls High School
Results
Montague, MA 01376

Mechanical Services
Post-Bid
Less than $800,000 est. value

Condenser Unit Replacement, East Building - General Bids
Results
$220,000 est. value
Greenfield, MA 01301

Wendell Free Library Heat Pumps
Post-Bid
Less than $30,000 est. value
Wendell, MA 01379

DPW Yard Boiler Repair
Results
$14,020 est. value
Greenfield, MA

Wendell Library Heat Pumps
Post-Bid
Less than $30,000 est. value
Wendell, MA

Buckland Shelburne Ventilation Repairs
Results
Shelburne Falls, MA 01370

Residential Heating System Repairs & Replacement
Post-Bid
Greenfield, MA

HVAC Control Upgrades
Results
$300,000 est. value
Shelburne Falls, MA 01370

Residential Heating System Repairs & Replacement
Post-Bid
Greenfield, MA

HVAC System Modifications Office Building
Results
$95,500 est. value
Montague, MA 01376

Air Vent Cleaning of Aviation Hangars
Post-Bid

Reported 09/25/2020 12:00 AM
Project Title

Greenfield Police Department HVAC Unit Replacement

Physical Address View project details and contacts
City, State (County) Greenfield, MA 01301   (Franklin County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 09/02/20
Owner View project details and contacts
Architect View project details and contacts
Description

The replacement of 12 Roof Top Units (RTUs),1 A/C condenser/air handler unit, and one mini-split A/C unit at the Greenfield Police Department at 325 High Street in Greenfield, MA. In addition, one mini-split heat pump is required for the Dispatch Room. The proposal shall be all inclusive to remove existing HVAC equipment and replace with new high efficiency units.The Contractor shall be re-sponsible for size and selection of the optional mini-split heat pump.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents