Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

Valve Boxes
Infrastructure
Bidding
Madison, WI

Educational Science and Horticulture Site Utility Replacements - GPC
Infrastructure, Alteration
Bidding
$1,600,000 est. value
Madison, WI

Hydrants
Infrastructure
Post-Bid
Madison, WI

Curb Boxes
Infrastructure
Post-Bid
Madison, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

Promega Kepler Warehouse
Addition, Infrastructure - 135,000 SF
Construction
Fitchburg, WI 53711

Pickleball Expansion and Park Improvements
Renovation, Infrastructure
Bidding
Sun Prairie, WI

Ductile Iron Pipe
Infrastructure
Post-Bid
Madison, WI

Sandhill Elementary School Pavement Restoration - Parking Lot and Playground Service Drive
Results
Stoughton, WI 53589

2022 Concrete Restoration - Phase I
Infrastructure
Bidding
Madison, WI 53703

Gate Valves
Infrastructure
Post-Bid
Madison, WI

Rockstream Drive Assesssment District - 2020
Results
Less than $2,136,420 est. value
Madison, WI 53719

Wildcat Way Water Main Extension
Infrastructure
Bidding
$250,000 est. value
Verona, WI

Last Updated 03/22/2022 01:02 PM
Project Title

Clark Street and Grove Street Reconstruction

Physical Address View project details and contacts
City, State (County) Cottage Grove, WI 53527   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are asked includes the following: The Village of Cottage Grove is completing a reconstruction of Clark Street and Grove Street within the Village. The reconstruction will include urbanizing of a majority of the roadway with concrete curb and gutter and sidewalks. The roadway will be expanded to include additional parking along the roadway. Storm sewer improvements and a water main extension is included within the project. Additional areas of work include pulverizing of roadways and relaying asphalt pavement and culvert replacements. Stormwater facilities are included along with restoration throughout the project.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents