Similar Projects
RFP - Thornton Transit Study
Term Contract
Conception
Thornton, CO 80229

Owners Rep for New Construction/Cap Improvements
Design
CO

RFP Construction Manager - ARPA Road Resurfacing Project
Infrastructure
Design
$3,000,000 CJ est. value
Colorado Springs, CO 80903

Rabbit Valley Recreation Area Improvements
Demolition, Infrastructure, Renovation
Bidding
$1,000,000 CJ est. value
Mack, CO 81525

ANS Decontamination Facility
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Ridgway, CO 81432

Power and Control Cable and Wire, Loveland, CO
Term Contract
Sub-Bidding
Loveland, CO 80537

As-Needed Tent, Canopy, and Modular Structure
Term Contract
Sub-Bidding
Bellvue, CO 80512

Insecticides
Post-Bid
Craig, CO

Portable Sanitation Services
Post-Bid

Janitorial Services for BLM Grand Junction Headqua
Results
Grand Junction, CO 81506

Snow Services, Co130 Windsor Colorado
Results
Windsor, CO 80550

RFQ - Clermont Underground Storage Tank Inspection and Testing - 554
Term Contract
Pending Verification
Denver, CO 80220

Ziggis Coffee Shop and Retail Building
New Construction, Infrastructure - 3,124 SF
Pending Verification
$750,000 CJ est. value
Fort Collins, CO 80524

Pavement Overlay and Construction of Sedimentation Ponds for County Road 170
Infrastructure
Design
$200,000 CJ est. value
Evergreen, CO 80439

TRFO Painted Hand
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Pleasant View, CO 81331

Last Updated 08/02/2022 03:31 AM
Project Title

On-Call Asphalt Restoration

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81006   (Pueblo County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Maintenance, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

To secure services for on-call asphalt restoration throughout the Pueblo West area. These services are to include, but not limited to the removal of existing base course material to allow for the installation of asphalt or temporary cold mix; the removal of existing asphalt or cold mix to allow for the installation of asphalt; the milling of asphalt to create a lap joint between new and existing asphalt; the installation of cold mix for temporary patching; asphalt patching of various depths; and asphalt overlays over existing roadways. Question Acceptance Deadline 08/03/2022 06:00 PM EDT Questions are submitted online No

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents