Similar Projects
Taxiway Lighting Reconstruction
Infrastructure
Sub-Bidding
$260,000 CJ est. value
Rogers, AR 72756

Emergency Generator and Automatic Transfer Switch at Well #1
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Cave City, AR 72521

Transformers for the North Little Rock Electric Department
Alteration
Post-Bid
North Little Rock, AR 72114

Standby Generator Project - Cedar Piney Water Treatment Plant
Alteration
Post-Bid
Danville, AR

Electrical Renovation on Second Floor and Basement at the Independence County Courthouse
Renovation
Results
$76,000 est. value
Batesville, AR

Pole Type Distribution Transformers
Renovation, Alteration
Results
Bentonville, AR

Construction of the Senior Center Generator Set
Alteration
Post-Bid
Fairfield Bay, AR 72088

IDIQ General Maintenance at Pine Bluff Site Office
Term Contract
Results
Pine Bluff, AR 71601

EM Warehouse Emergency Power Install Emergency Power Connections
Term Contract
Post-Bid
Little Rock, AR 72205

Single Phase Transformers
Alteration
Results
Bentonville, AR

Arkansas State Capitol Police Emergency Generator, Panels Infrastructure Installation
Alteration
Post-Bid
Little Rock, AR

Pole Type Transformers
Alteration
Results
Bentonville, AR

CL200, I210+C Meters with Remote Disconnect, Integrated Synergize and D-Ring Reset Cover on Meters
Alteration
Post-Bid
Osceola, AR

3 Phase Backup Generator
Alteration
Results
$35,000 est. value
Stuttgart, AR 72160

Installation of Hard-Wired Battery Backup Smoke/CO Detectors and Electrical Upgrades
Alteration
Post-Bid
Van Buren, AR

Last Updated 07/05/2023 12:14 PM
Project Title

Pedestrian Traffic Signal

Physical Address View project details and contacts
City, State (County) Hot Springs National Park, AR 71901   (Garland County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $185,162 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All responses must be submitted no later than the date and time shown above for consideration.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents