Similar Projects
Sandy City Well and Pump Station Maintenance Services (2020/21)
Post-Bid
Sandy, UT 84070

6200 South Zone C Pump Station
Term Contract
Post-Bid
West Jordan, UT 84081

Sewer Pump Station 1
Results
Less than $12,000,000 est. value
Salt Lake City, UT

Construction of the Booster Pump Station
Results
Less than $55,000 est. value
Herriman, UT 84096

Stonebridge Maintenance Variable Speed Pump Station Replacement
Post-Bid
West Valley City, UT 84120

SLC Airport Pumphouse Station #1
Results
Salt Lake City, UT 84122

Industrial Lift Station Rehab and Piping Upgrades
Post-Bid
Salt Lake City, UT

Golden Hills Pump Station Rehabilitation
Results
$276,000 est. value
Cottonwood Heights, UT 84121

Zone 2 and 3 Pump Station and Pipeline Project
Post-Bid
Herriman, UT 84096

500 West Lift Station Rehabilitation
Results
$274,000 est. value
Salt Lake City, UT 84115

SLC WRF Influent Pump Rebuild Project
Post-Bid
Less than $369,000 est. value
Salt Lake City, UT

900 North Lift Station Rehabilitation
Results
Less than $1,257,000 est. value
Salt Lake City, UT 84115

20E Pioneer WWPS Replacement Project
Renovation
Post-Bid
$1 to $3,400,000 est. value
West Valley City, UT

New Rose Park Lift Station Replacement (SS02)
Results
Less than $419,000 est. value
Salt Lake City, UT 84116

Rosecrest Pump Station Improvements Project
Results
Less than $998,000 est. value
Herriman, UT 84096

Last Updated 09/04/2020 05:22 PM
Project Title

Airport Pump Station Pump 5 and Motor Installation

Physical Address View project details and contacts
City, State (County) West Jordan, UT 84088   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rebuilt pump and to provide and install a new motor at the Airport Pump Station located at 4070 West 7800 South. The pump station consists of 4 working pumps with a fifth empty pump barrel location. The new motor and rebuilt pump will be installed in the empty fifth pump barrel. Provide all parts, equipment, and labor to provide and install a new 300 HP Motor as per the attached specification; Install a City-owned rebuilt pump; Fabricate and install a 14-inch discharge head; Provide and install all parts and appurtenances including mechanical seal and housing, water lubrication and drainpipe, shafts, bearings, gaskets, bolts, and connect to existing pipes; Test pump operation and make any necessary adjustments for a complete and operable pumping station. Work needs to be completed within 4 months after contract award

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents