Similar Projects
FY20 Neches Salt Water Basin Stop Logs
Design
$1,000,000 to $5,000,000 est. value
Beaumont, TX 77703

Mcfaddin National Wildlife Refuge Beach Restoration Phase 2
Bidding
$55,400,000 to $66,800,000 est. value
Sabine Pass, TX 77655

Repair Seven (7) Drainage Pump Stations
Post-Bid
Port Arthur, TX

USACE Galveston District, Sabine Neches Waterway PA11 Containment Dike Raise in Jefferson County, Texas
Post-Bid
$1,000,000 to $5,000,000 est. value
Beaumont, TX

Atlantic Canal Crossing Improvements 2nd Street thru 12th Street
Results
$5,180,000 est. value
TX

Port Arthur Hurricane Flood Protection Project (HFPP) Harvey Repairs in Jefferson County, Texas.
Results
$1,000,000 to $5,000,000 est. value
TX

Placement Area 18 Levee Project
Post-Bid
Port Arthur, TX 77642

Center Street Ditch Cleaning Project
Results
$37,500 est. value
TX

On-Call Plumbing/Sewer and Drain Services
Term Contract
Post-Bid
Port Arthur, TX 77640

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

Placement Area 9 Levee Project
Post-Bid
Port Arthur, TX 77642

Beaumont Municipal Airport Ditch Cleaning and Repair Project
Results
Less than $97,000 est. value
Beaumont, TX

Placement Area 26 Levee Construction Project
Post-Bid
Port Arthur, TX 77642

Improvements to Cathodic Protection System for Bulkhead at Berths 3 & 4
Post-Bid
Port Arthur, TX 77640

Improvements to Shamrock Ditch and Rodair Lateral 3
Post-Bid
Port Arthur, TX 77642

Last Updated 12/21/2020 03:55 PM
Project Title

Sabine Pass Area Drainage System Select Ditch Cleanout

Physical Address View project details and contacts
City, State (County) Sabine Pass, TX 77655   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Mow and/or strip vegetation and de-muck/excavate the flowline of the designated ditches from top of bank to top of bank. 2. For estimating purposes, the ditches will be de-mucked to an approximate depth of 2-3 feet below the existing sediment using an excavator. 3. Spread removed vegetation and sediment outside of the flowline. 4. The estimated ditch length of the sediment removal is 14,800 linear feet. 5. The average width of the concealed flowline is less than 10 feet and the depth will average 2.5 feet.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents