Similar Projects
Installing Corrugated Steel Plates
Alteration
Bidding
$1,000,000 to $5,000,000 est. value
Byers, Denver, CO 80238

Installing Corrugated Steel Plates
Alteration
Bidding
$1,000,000 to $5,000,000 est. value
Byers, Denver, CO 80238

Steel Sheets
Post-Bid

Steel Sheets
Post-Bid

Steel
Results
CO

Pueblo Water - Annual Contract for Stainless Steel Repair Clamps 2021
Term Contract
Results
Pueblo, CO

Stainless Steel Hydraulic Pipe
Post-Bid
Denver, CO

Galvanized Steel Beams
Alteration
Results
CO

Steel Lining Insert Pipe
Alteration
Post-Bid
Berthoud, CO 80513

Galvanized Steel Beams
Alteration
Results
CO

SEP Williams Creek Substation High Steel
New Construction
Results
Fountain, CO

Sep Horizon High Steel
Alteration
Results
CO

Steel
Alteration
Results
CO

Stainless Steel Countertop for Evidence Storage
Alteration
Results
Greeley, CO 80634

Last Updated 05/18/2022 12:03 PM
Project Title

Pueblo Water - Annual Contract for Stainless Steel Repair Clamps 2022

Physical Address View project details and contacts
City, State (County) Pueblo, CO   (Pueblo County)
Category(s) Single Trades
Sub-Category(s) Steel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To enter into an annual contract for stainless steel repair clamps. Product literatures is a requirement to be included with your bid. An optional excel worksheet has been included to aide in your bid response. Please make sure your unit price calculations are accurate.

Details

Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents