Similar Projects
Hughes Main Library Roof Replacement
Results
Greenville, SC 29601

Selective Roof Replacement at Concrete Primary School Selective Roof Repairs at Cedar Grove E.S., Powdersville H.S., and Hunt Meadows E.S.
Results
Easley, Greenville, Williamston, SC 29642

Roof Leak Repair Program
Term Contract
Results
Taylors, SC 29687

Roofing Repair and Maintenance
Post-Bid

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Roof Replacement - Fountain Inn Police Department
Results
Fountain Inn, SC 29644

Roof Replacement Project - Taylors Elementary School
Results
Taylors, SC 29687

Roofing Contractors for Upcoming Roof Replacement Projects
Bidding
Taylors, SC

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roof Replacement Project - Overbrook Child Development Center
Post-Bid
Greenville, SC 29607

Roofing MACC
Post-Bid

Reroofing Construction Project - SCGSAH
Results
$400,000 to $550,000 est. value
Greenville, SC 29601

Dwelling Unit and Non-Dwelling Unit Improvements (Re-Roofing)
Post-Bid
Blacksburg, Calhoun Falls, Central, Chesnee, Fountain Inn, Inman, Landrum, McCormick, Pacolet, Pendleton, Seneca, Whitmire, York, SC

Roof Replacement Project at Greenville Middle Academy
Post-Bid
Greenville, SC 29607

Roofing Envelope Services
Post-Bid

Last Updated 06/01/2020 10:11 AM
Project Title

Roof Replacement Project - Riverside High School

Physical Address View project details and contacts
City, State (County) Greer, SC 29650   (Greenville County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

160,964 square feet of existing roof to be replaced at Riverside High School; the work will take place over two phases. Phase I is to be completed from June 9, 2020 through October 9, 2020. Phase I consists of existing Spray Applied Roof Systems and a Plaza Deck; Roof Areas F, N, O, P, Q, R (Plaza Deck), S, & T. Also included in Phase I; the repair of 24 clerestory windows above roof areas P and S. Phase II to be completed in June- October of 2021 include the existing Spray Applied Roof Systems of Roof Areas A, B, C, D, E, G, H, I, J, K, L, M, & U. The new roof system will be a 2-ply modified roof over a cover board; flat and tapered polyISO insulation; and vapor barrier. Plaza deck will have a liquid-applied roof system below concrete pavers. Please note; the existing roof decks are concrete and metal.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents