Similar Projects
Elk Creek Channel Stabilization
Infrastructure
Post-Bid
Omaha, NE

West High School Softball Field Drainage Improvements
Infrastructure
Post-Bid
Omaha, NE 68135

Gilmore-Sarpy Avenue Green Infrastructure 2021
Infrastructure
Results
Omaha, NE 68107

NP Dodge Park Marina - Marina Wall Repair 2021
Infrastructure
Results
Omaha, NE 68112

Hell Creek at Westwood Lane Stream Restoration Maintenance
Infrastructure
Post-Bid
Omaha, NE 68144

117th Street and State Street Improvements (Grading, Paving and Erosion Control)
Infrastructure
Results
Omaha, NE 68112

Rainwood Road - Grading, Storm Sewer, Paving, and Erosion Control - Section I
Infrastructure
Post-Bid
Omaha, NE

Retaining Wall Replacement at 19th Street North of Pierce Street
Infrastructure
Results
NE

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

Grace Street CSO Ditch Screen
Infrastructure
Results
Omaha, NE 68139

6th Street Culvert Replacement, South of Ponca Road
Infrastructure
Results
Omaha, NE

51st and Madison Streets Creek Stabilization
Infrastructure
Results
Omaha, NE 68139

168th Street Road Improvements
Infrastructure
Results
Bennington, Omaha, NE 68007

N-36 N-133 East
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
NE

State Street Improvements, Potter Street to State Street (Grading, Asphalt Paving, and Erosion Control)
Infrastructure
Results
Omaha, NE 68139

Reported 04/21/2022 12:00 AM
Project Title

The Knolls Erosion Repair

Physical Address View project details and contacts
City, State (County) Omaha, NE 68164   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center - 03/23/22
Owner View project details and contacts
Architect View project details and contacts
Description

SEB: 2% The proposed stabilization involves installation ofsheet pile along the east bank ofthe Papillion Creek, adjacent to the Knolls GolfCourse where scour and erosion issues were realized. The top elevation of the sheet pile wall along the entire alignment is proposed at approximately 1,051 feet, tying in to lower grades ranging from 1,037 to 1,029 feet. Based on our analysis provided in the following sections of the report, we estimate a minimum sheet pile wall length of45 feet. Controlled structural fill will then be placed behind the sheet pile to match existing elevations of approximately 1,051 feet

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents