Similar Projects
Cedar Street and Driftwood Street Improvements
Bidding
Royalton, MN

Interceptor 1-MN-341 Pipe-in-Pipe Rehabilitation
Bidding
MN

Inspection and Cleaning of Sanitary and Storm Water Piping
Term Contract
Post-Bid
Moorhead, MN 56563

Phase 3A-2 Infrastructure Improvements
Post-Bid
Tracy, MN

Vincent Avenue North Sanitary and Storm Sewer
Renovation
Results
Minneapolis, MN 55401

Medina Country Club Sewer Rehabilitation
Results
$108,000 est. value
Medina, MN 55340

Grading, Aggregate Base, Bituminous Surfacing,Curb/Gutter, and Storm Sewer
Bidding
MN

2021 Infrastructure Improvements
Post-Bid
$1,500,000 to $2,000,000 est. value
MN

2020 Stormwater Improvements
Results
Monticello, MN 55362

4th Street South Reconstruction
Bidding
$1,200,000 to $1,500,000 est. value
South Saint Paul, MN 55075

2021 Storm Sewer Televising Services
Post-Bid
Newport, Oakdale, MN

Pond and Storm Sewer Maintenance
Results
Bloomington, Minneapolis, MN

Grading, Aggregate Base, Bituminous Surfacing, Concrete Curb and Gutter, Concrete Walks, Water Main, Sanitary Sewer, and Related Restoration
Bidding
MN

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Rehab of Twin 42-Inch RCP SS Pipes Under Fieldhouse
Renovation
Results
Less than $1,100,000 est. value
Worthington, MN

Last Updated 04/19/2021 03:40 AM
Project Title

Storm Structure Outfall Improvements

Physical Address View project details and contacts
City, State (County) Marshall, MN   (Lyon County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $56,165
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the following: Installation of stormwater manholes on South Saratoga Street south of Continental Street and adjacent to the north bank of the Redwood River Diversion Channel approximately 800 feet east of US 59. This project will also include installation of a check valve and turf restoration

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents