Similar Projects
Waste Heat Loop Construction
New Construction
Results
Madison, WI 53713

Dump Station Reconfiguration/Relocation MEP
Results
Less than $205,000 est. value
Kansasville, WI

South Landfill Buildings
New Construction
Results
WI 53093

Phase 3 Gas System
Results
$100,000 est. value
Friendship, WI

Landfill Well Abandonment & Installation
Post-Bid
Appleton, WI 54911

Natvig Road Landfill Gas Vents
Bidding
Cottage Grove, WI 53527

Last Updated 10/02/2020 03:50 PM
Project Title

Refuse Hideaway Landfill Source Control Systems Repairs and Upgrades

Physical Address View project details and contacts
City, State (County) Madison, WI 53562   (Dane County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract is for the repairs and upgrades necessary to restore the following source control systems: • Landfill Final Cover – including vegetation removal, filling, seeding, and fence installation. • Stormwater Control – including removal of sediment from the sedimentation basin, repair of the sedimentation basin, installation of an emergency overflow spillway, repair of the western drainage ditch, vegetation removal, and fence installation. • Leachate Extraction System – including procurement, installation, and start-up of equipment as specified from extraction pumps to control equipment. • Landfill Gas Extraction System – including procurement, installation, and start-up of equipment as specified from extraction pumps to control equipment to bring landfill gas to a common vent stack. The construction schedule to complete primary field work under this contract shall be for approximately 6 weeks and may only be extended through a mutual agreement between the Department and the Contractor.

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents