Similar Projects
Underground Utility Infrastructure Improvements - C340A7
Renovation, Infrastructure
Conception
$1,500,000 est. value
Toledo, OH 43606

YMCA Expansion
Addition, Infrastructure
Conception
$1,000,000 CJ est. value
Sylvania, OH 43560

Eleanor Avenue Roadway Resurfacing and Water Main Replacement
Infrastructure
Design
$1,696,574 CJ est. value
Toledo, OH 43612

Eleanor Avenue Roadway Resurfacing and Water Main Replacement
Infrastructure
Design
$1,696,574 CJ est. value
Toledo, OH 43612

LUC Secor Road over Ottawa River Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Toledo, OH 43623

Sanitary Sewer Rehabilitation Project - Trunk Sewer and Miscellaneous Lateral Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Oregon, OH 43616

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Conant, Harrison and Broadway Streets Uptown Waterline Replacement
Infrastructure
Post-Bid
Maumee, OH 43537

Vermaas Water Main Replacement
Results
Toledo, OH

Uptown Waterline Extensions
Results
Maumee, OH

Construction Management at Risk Services RFQ - Parking Lot Project 2021
Construction
$8,000,000 est. value
Toledo, OH 43609

Street Resurfacing and Reconstruction - Toledo
Infrastructure
Pending Verification
$5,440,000 CJ est. value
Toledo, OH 43604

Village on the Green
New Construction, Infrastructure - 150,684 SF
Pending Verification
$41,200,000 CJ est. value
Toledo, OH 43604

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$530,000 CJ est. value
Martinsville, OH 45146

Safety Building Sanitary Lift Station New Tank and Modifications
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Toledo, OH 43604

Last Updated 09/06/2022 06:34 AM
Project Title

2022 GCCS Construction, Hoffman Road Landfill

Physical Address View project details and contacts
City, State (County) Toledo, OH 43611   (Lucas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Q&A deadline is extended accordingly to September 8, 2022 at 5:00 p.m. Project Type Bid License Requirements No Specific Requirements Liquidated Damages $400/day Start/Delivery Date December 31, 2022 Project Duration 3-4 weeks Bid Bond 5.00% Payment Bond 0.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 08/23/2022 5:00 PM (EDT) Hoffman Road Landfill Gas Collection & Control system construction. Work includes drilling replacement wells, horizontal/trench well construction, installing associated piping, making completed well connections for vacuum, air and forcemain, providing/installing new pumps, wellheads and all necessary fittings. Additional work includes reconfiguring lids for leachate collection risers. If using a check as the bid guaranty, the check must be scanned and uploaded with your bid. In addition, the check must be received by the Division of Purchases and Supplies no later than the due date and time to be deemed responsive. No Company checks / No Personal Checks will be accepted. Checks shall be made payable to City of Toledo. If your company does not provide a bid guaranty, your bid submittal will be deemed non-responsive. (TMC 187.09) City of Toledo Division of Purchases and Supplies One Government Center, Suite 2000 640 Jackson Street Toledo, OH 43604 City forms must be filled out and attached to the bid: Project Paperwork (Acknowledgment and Acceptance of Conditions Contract Specifications; Toledo Municipal Income Tax Compliance; Public Utilities Compliance; MBE Good Faith and Goal Commitment; EEO Form; Primary and Subcontractor Forms and Debarment and Suspension Certificate; Best Bid Criteria); Signed Contract by Vendor CEO/President; Current Workers Compensation Certificate; Insurance Certificate listing the city of Toledo as an additional insurer; Child Support Affidavit; and Tax Exemption Certificate. The Work shall commence within ten (10) days, and be Substantially Completed within 45 days from the Notice to Proceed and fully completed within 60 days from the date of Substantial Completion Question Deadline 08/30/2022 at 5:00 PM

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents