Similar Projects
Farmstone Meadows Residential Subdivision
New Construction, Infrastructure
Conception
$38,300,000 CJ est. value
Willow Springs, NC 27520

Woodleaf
New Construction, Infrastructure
Conception
$191,700,000 CJ est. value
Smithfield, NC 27577

The Copper District Phase II - Force Main Project
New Construction
Design
Clayton, NC

Clayton Village Center Mixed Use Development
New Construction, Infrastructure - 80,000 SF
Design
$25,000,000 CJ est. value
Clayton, NC 27520

CDBG-I Sewer Rehabilitation/Replacement
Infrastructure
Bidding
Selma, NC 27576

Equipment Storage Building
New Construction, Infrastructure - 2,700 SF
Bidding
$500,000 CJ est. value
Clayton, NC 27520

RFQ D/B - Timothy G. Broome Water Treatment Plant Expansion
Addition, Demolition, Infrastructure
Post-Bid
$55,200,000 CJ est. value
Smithfield, NC 27577

Hangar Site Development and Parking Lot Expansion - Rebid
Demolition, Infrastructure
Post-Bid
$4,445,852 CJ est. value
Smithfield, NC 27577

Wilson's Mills Pump Station Improvements
Renovation
Results
$1,520,000 CJ est. value
Smithfield, NC 27577

Smithfield Middle School New Canopy Entrance
Infrastructure
Results
$303,000 CJ est. value
Smithfield, NC 27577

NC 96 Four Oaks Economic Development Water Main Extension
Infrastructure
Construction
$1,724,038 CJ est. value
Smithfield, NC 27577

Johnston Memorial Hospital Medical Office Building
New Construction, Infrastructure - 26,600 SF
Construction
$15,000,000 CJ est. value
Clayton, NC 27527

Wilder's Market
Demolition, New Construction, Infrastructure - 4,500 SF
Pending Verification
$4,000,000 CJ est. value
Clayton, NC 27520

Country Lane Residences
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Clayton, NC 27520

New Middle School - Johnston County Schools
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Selma, NC 27576

Last Updated 08/28/2023 03:05 PM
Project Title

Clayton to Raleigh Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Clayton, NC 27520   (Johnston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,088,518 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 28, 2023, this project has not yet been awarded. A timeline or award has not yet been established. The Project includes the following Work: Mechanical, electrical and structural improvements to the existing Clayton-to-Raleigh Pump Station to increase its capacity. The Town of Clayton is requesting proposals to provide new submersible wastewater pumps and variable frequency drives to replace existing equipment at the existing Clayton-Raleigh/Neuse 2 Pump Station (CRPS), to increase overall wastewater conveyance capacity of this facility. The objective of this Request for Proposals (RFP) is to select a pump and variable frequency drive (VFD) Supplier to provide the equipment and to have the selected Equipment Supplier coordinate with the Engineer during the design of the project. The pump and VFD equipment will be purchased by the General Contractor when the project is constructed, tentatively scheduled for Fall 2023. The Town of Clayton (Town) utilizes the Clayton-to-Raleigh Pump Station to convey a portion of the Town's raw wastewater flow to the City of Raleigh's Neuse River Resource Recovery Facility (NRRRF). The Neuse 2 Pump Station is currently configured to pump wastewater from this site to the Town of Clayton's Little Creek Water Reclamation Facility (LCWRF). These two pump stations are located adjacent to one another onthe same site. A cross-connection is in place so either pump station could pump to either destination. Flow is rarely conveyed to the LCWRF. Currently, the Town has capacity to pump 2.3 million gallons per day (MGD) ofwastewater to the NRRRF. Due to anticipated increases in tributary flow, Clayton desires to increase the amount offlow to be pumped to the NRRRF to 4.5 MGD. This project will include replacement ofthe existing pumps, VFD's and necessary appurtenances. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents