Similar Projects
Concrete Work for the Mae Meissner Whitaker Park
Infrastructure
Design
$400,000 CJ est. value
Bunker Hill, IL 62014

Sealcoating Maintenance at Chicago Rockford International Airport
Infrastructure
Bidding
$400,000 CJ est. value
Rockford, IL 61109

Grayslake Campus Exterior Concrete Staircase
Renovation
Sub-Bidding
$152,000 CJ est. value
Grayslake, IL 60030

Longview Park Demolition and Regrading
Demolition, Infrastructure
Sub-Bidding
$35,000 CJ est. value
Rock Island, IL 61201

Concrete Work - Mounting Pad for J-Hull Printer
Term Contract
Results
$250,000 to $500,000 est. value
Rock Island, IL 61299

Building Demolition Project - Hickory Grove Banquet Center
Demolition, Infrastructure
Results
$361,900 CJ est. value
Rochelle, IL 61068

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

Concrete Replacement Work
Alteration
Results
Shelbyville, IL 62565

Single Span Reinforced Concrete
Alteration
Results
Joliet, IL

Concrete - Various Sites District Wide Plus Alternative Work
Alteration
Results
Algonquin, Carpentersville, IL 60102

Metamora Township High School HVAC Renovation
Alteration
Results
Metamora, IL

2022 Concrete Flatwork
Alteration
Results
Lake Zurich, IL

Miscellaneous Concrete Repairs
Alteration
Results
Batavia, IL 60510

James Street Pump Station
Renovation, Infrastructure
Results
$1,260,597 CJ est. value
Plainfield, IL 60544

Last Updated 08/12/2023 02:11 AM
Project Title

Replacement of 3 Culverts on Il 3

Physical Address View project details and contacts
City, State (County) Grand Tower, IL 62942   (Jackson County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,188,576 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of 3 culverts on IL 3: SN 039-2013(E) over a stream 1.8 miles east of the Randolph County line; SN 039-2014(E) over a drainage ditch 0.1 miles southeast of Raddle Road; SN 039-2015(E) over Talbott Hollow Creek 1.1 miles northwest of IL 151. Region 5 District 9 Federal Project # N/A County(s) Jackson Key Route(s) FAP 312 Marked Route(s) IL 3 Section(s) 123B-5;123B-6;123B-7 State Job #(s) C-99-063-20 PPS #(s) 9-00387-0000 9-99095-0000 9-99100-0000 110 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 158 - Replacement of 3 Culverts on Il 3 Project Description The project consists of the replacement of a double barrel reinforced concrete box culvert (existing SN 039-2014) located at IL-3 over Drainage Ditch in Jackson County, Illinois. The general location of the proposed structure is shown on a Location Map, Exhibit A. The project is located approximately 2.8 miles northwest of IL-151 in Rockwood, Illinois. The site lies within the limits of the Third Principal Meridian (T. 8S R. 4W) within the Shawnee Hills Section of the Interior Low Plateaus Province.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents