Similar Projects
Gym Floor Refinish
Bidding
Rome, GA

Replacement of Carpet and Tile at Various Police Department Locations
Bidding
Buford, Duluth, Lawrenceville, GA 30519

Justice Center Tunnel Flooring Replacement
Post-Bid
Fayetteville, GA 30214

GGC Building F- Gym Floor Replacement
Post-Bid
Lawrenceville, GA 30043

Replace Gym Flooring at an Elementary School
Results
Saint Simons Island, GA 31522

Detention Center Flooring
Results
Dahlonega, GA 30533

Tile Floor Resurfacing for Fayette County Public Schools
Bidding
Fayetteville, GA

72--Epoxy Garage Flooring
Post-Bid
Fort Benning, GA

Lou Walker Senior Center Locker Room Floor Replacement
Results
Lithonia, GA

Tile Floor Removal/Concrete Floor Refinishing
Bidding
GA

Luxury Vinyl Flooring Installation
Post-Bid
Cedartown, GA

Remove Carpet and Replace Tile
Results
Cumming, GA 30040

LVT and Carpet Replacement Installation at Marietta Fire Department Station #51
Post-Bid
Marietta, GA 30061

Fire Station 10 Flooring and Painting
Results
Fayetteville, GA 30215

Flooring Improvements To The Deed Room
Post-Bid
Sandersville, GA

Reported 02/28/2020 12:00 AM
Project Title

Refinishing Gym Floor - Mack Gaston Community Center, Dalton Parks And Recreation

Physical Address View project details and contacts
City, State (County) Dalton, GA   (Whitfield County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Two Hardwood Gym Floors. Both gyms are required to be done simultaneously completed and ready to open in 7-10 working days. Gyms will be available to begin work April 5, 2020 The entire gym floor, except the area under the bleachers when in the fully closed position, is to be screened and cleaned. Winning bidder is responsible for clean-up and disposal of trash associated with project. A dumpster is located on the backside of the gym. Three (3) coats of "Bona All Court" polyurethane oil base high gloss finish. Price to include removal of any gum, tape or tape residue. Re-paint all court lines only as needed. Extra caution is to taken on center court logo. This will require light hand sanding over logo. Bidders are responsible for measuring exact square footage. A site visit is encouraged.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents