Similar Projects
Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

Gaoa - Salmon River Road Corridor Rec. Site Maintenance (Surface Rock) 4Cn
Term Contract
Design
$100,000 to $250,000 est. value
ID

Constructing a New Eastbound Port of Entry (POE) Facility on I-84 at MP 219 and Removing the Existing Cotterel POE
Infrastructure
Bidding
$10,000,000 to $15,000,000 est. value
ID

Wildlife Overpass at Cervidae Peak, MP
Term Contract
Bidding
$3,000,000 to $5,000,000 est. value
Boise, ID 83716

Pipe and Guardrail Replacement
Infrastructure
Post-Bid
$5,000,000 to $10,000,000 est. value

Pipe and Guardrail Replacement
Infrastructure
Post-Bid
$5,000,000 to $10,000,000 est. value

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Road Improvement Project on the Sawtooth National Forest
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Stanley, ID 83278

Rehabilitating Chestnut Street from Jackson Street to Cedar Street
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
Genesee, ID

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Post-Bid
ID

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Constructing Intersection Improvements with Signal Improvements, Additional Left-Turn Lane and a Dedicated Right-Turn Lane
Infrastructure
Bidding
ID

Culdesac Canyon Passing Lane, PH 3
Infrastructure
Post-Bid
$10,000,000 to $15,000,000 est. value

Widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes
Infrastructure
Results
ID

Last Updated 03/18/2022 03:44 AM
Project Title

N Midland Boulevard and W Karcher Road Widening and Guardrail Repair

Physical Address View project details and contacts
City, State (County) Nampa, ID   (Canyon County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes removal of damaged guardrail and installation of new guardrail on the southeast corner of N Midland Boulevard and W Karcher Road. The project also includes lane widening on N Midland Boulevard and on W Karcher Road, including excavation, aggregate sub-base, aggregate base, paving, pavement markings, and construction traffic control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents