Similar Projects
Repair Slumps on Hurricane Ridge and Obstruction Point Road
Alteration
Design
Port Angeles, WA

UST Inspect Maintain and Repair
Alteration
Design
$1,000,000 est. value
WA

US 101, Jefferson and Clallam County - Remove Fish Barriers
Infrastructure
Bidding
$5,000,000 to $70,000,000 est. value

US 101, Jefferson and Clallam County - Remove Fish Barriers
Infrastructure
Bidding
$5,000,000 to $70,000,000 est. value

Garrison Middle School Sidewalk Improvement
Infrastructure
Post-Bid
Walla Walla, WA 99362

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

Mount St. Helens Spirit Lake Intake Headwall
Alteration
Bidding
$10,000,000 to $20,000,000 est. value
Cougar, WA 98616

Guardrail and Curve Improvements
Infrastructure
Post-Bid
WA

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Fall City Floodplain Restoration Planting
Alteration
Design
$1,000,000 est. value
WA

I-90/I-5, E Sunset Way Vic and Nb Lowell Rd Vic Pccp Exp Jnt Rehab and Deck Overlay
Infrastructure
Bidding
Less than $1,250,000 est. value

2019 Guardrail and Signage Project
Infrastructure
Post-Bid
Stevenson, WA

Reported 01/28/2022 12:00 AM
Project Title

Public Access Enhancement to Willapa National Wildlife Refuge Phase II

Physical Address View project details and contacts
City, State (County) Long Beach, WA 98631   (Pacific County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Public Access Enhancement to Willapa National Wildlife Refuge Phase II

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents